ELBOW,90DEG,1/4IN,3000#,A234WPB,BW

Material 4100029671 · ELBOW · Plant 1000

AMonitorHealthy
Material
4100029671
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 23 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
17 d · P80 23 d
Unit price
Rp 669,271

Recommendation

  • 1.Forecast 229 EA/year: 229 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~17 days; expected demand during lead time 11.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 112.
  • 4.Installed on 23 FuncLoc(s), 7 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 116Single sourceAbnormal consumption
On hand / on order
104 / 0
no open PO
Today Min / Max
47 / 74
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 30
Rec. Max
112
order qty 72
Service level
100.0%
stockout risk now 0%
Unit price
Rp 669,271
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 23 issue days in the last 180 days, last issue 1 days ago, 50 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 14 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (134 units) excluded from the baseline.

Demand pattern Smooth · 82 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 23 functional locations

7 with criticality A/B · 35 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_BF-112
CRACKING FURNACE BF-112
A47327.01
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A22911.58
PX_20-HS-1722-B21A-T
PIPE->16 FROM VD-749A TO HE-236B
B110.44
PX_2-IA-3984-B23A-C
PIPE-2 FROM VD-419 TO PP-370B
B200.01
PX_3/4-FG-6875-B21A-T
PIPE-3/4 FROM PP-1337 TO VD-511A
B100.01
PX_10-BF-13397-D12A-H
PIPE-10 FROM PP-681B TO VD-793A
C110.01
PX_2-FG-20536-A11A-H
PIPE-2 FROM VD-1731C TO HE-1690C
C110.44
PX_2-HS-25182-A41A-T
PIPE-2 FROM PP-120B TO HE-1256A
C110.44
PX_1-1/2-HS-18026-A41A-HS
PIPE-1-1/2 FROM VD-939 TO KC-853D
C100.01
PX_1-1/2-P-12508-A11A-H
PIPE-1-1/2 FROM HE-1932 TO PP-362B
C100.01

Lead time and procurement

Lead time 17 ± 8 days (PO history, 31 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
10 Sept 2026PR03
Regular replenishment
152Rp 663,89720 Sept 202610 d
14 Aug 2026PR03
Regular replenishment
137Rp 661,03210 Sept 202627 d
11 Aug 2026PR03
Regular replenishment
233Rp 676,28728 Aug 202617 d
07 Aug 2026PR06
Regular replenishment
216Rp 682,66516 Aug 20269 d
05 Aug 2026PR03
Regular replenishment
246Rp 650,02515 Aug 202610 d
31 Jul 2026PR05
Project / turnaround
176Rp 662,36707 Sept 202638 d
31 Jul 2026PR03
Regular replenishment
131Rp 659,59118 Aug 202618 d
27 Jul 2026PR03
Regular replenishment
151Rp 693,01512 Aug 202616 d
21 Jul 2026PR03
Regular replenishment
154Rp 657,84330 Jul 20269 d
21 Jul 2026PR03
Regular replenishment
194Rp 667,94508 Aug 202618 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026LowPX_BF-103Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000024363Corrective
06 Sept 20261201000030840Corrective
23 Aug 20264201000013554Corrective
23 Aug 20264201000029373Corrective
09 Aug 20262201000030506Corrective
31 Jul 20264201000025825Corrective
15 Jul 20261201000039857Corrective
14 Jul 20264201000028281Corrective
12 Jul 20262201000021933Corrective
07 Jul 20262201000013665Corrective
24 Jun 20262209000014083Other maintenance
21 Jun 202620209000016742Other maintenance
15 Jun 20266204000004477Preventive
13 Jun 20266201000034439Corrective
02 Jun 20263201000022564Corrective