ELBOW,90DEG,1/4IN,3000#,A234WPB,BW
Material 4100029671 · ELBOW · Plant 1000
AMonitorHealthy
- Material
- 4100029671
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 23 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 17 d · P80 23 d
- Unit price
- Rp 669,271
Recommendation
- 1.Forecast 229 EA/year: 229 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~17 days; expected demand during lead time 11.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 112.
- 4.Installed on 23 FuncLoc(s), 7 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 116Single sourceAbnormal consumption
On hand / on order
104 / 0
no open PO
Today Min / Max
47 / 74
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 30
Rec. Max
112
order qty 72
Service level
100.0%
stockout risk now 0%
Unit price
Rp 669,271
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 23 issue days in the last 180 days, last issue 1 days ago, 50 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 14 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (134 units) excluded from the baseline.
Demand pattern Smooth · 82 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 13.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 23 functional locations
7 with criticality A/B · 35 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 4 | 114 | 42.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 4 | 73 | 27.01 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 2 | 29 | 11.58 |
| PX_20-HS-1722-B21A-T PIPE->16 FROM VD-749A TO HE-236B | B | 1 | 1 | 0.44 |
| PX_2-IA-3984-B23A-C PIPE-2 FROM VD-419 TO PP-370B | B | 2 | 0 | 0.01 |
| PX_3/4-FG-6875-B21A-T PIPE-3/4 FROM PP-1337 TO VD-511A | B | 1 | 0 | 0.01 |
| PX_10-BF-13397-D12A-H PIPE-10 FROM PP-681B TO VD-793A | C | 1 | 1 | 0.01 |
| PX_2-FG-20536-A11A-H PIPE-2 FROM VD-1731C TO HE-1690C | C | 1 | 1 | 0.44 |
| PX_2-HS-25182-A41A-T PIPE-2 FROM PP-120B TO HE-1256A | C | 1 | 1 | 0.44 |
| PX_1-1/2-HS-18026-A41A-HS PIPE-1-1/2 FROM VD-939 TO KC-853D | C | 1 | 0 | 0.01 |
| PX_1-1/2-P-12508-A11A-H PIPE-1-1/2 FROM HE-1932 TO PP-362B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 17 ± 8 days (PO history, 31 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Sept 2026 | PR03 Regular replenishment | 152 | Rp 663,897 | 20 Sept 2026 | 10 d |
| 14 Aug 2026 | PR03 Regular replenishment | 137 | Rp 661,032 | 10 Sept 2026 | 27 d |
| 11 Aug 2026 | PR03 Regular replenishment | 233 | Rp 676,287 | 28 Aug 2026 | 17 d |
| 07 Aug 2026 | PR06 Regular replenishment | 216 | Rp 682,665 | 16 Aug 2026 | 9 d |
| 05 Aug 2026 | PR03 Regular replenishment | 246 | Rp 650,025 | 15 Aug 2026 | 10 d |
| 31 Jul 2026 | PR05 Project / turnaround | 176 | Rp 662,367 | 07 Sept 2026 | 38 d |
| 31 Jul 2026 | PR03 Regular replenishment | 131 | Rp 659,591 | 18 Aug 2026 | 18 d |
| 27 Jul 2026 | PR03 Regular replenishment | 151 | Rp 693,015 | 12 Aug 2026 | 16 d |
| 21 Jul 2026 | PR03 Regular replenishment | 154 | Rp 657,843 | 30 Jul 2026 | 9 d |
| 21 Jul 2026 | PR03 Regular replenishment | 194 | Rp 667,945 | 08 Aug 2026 | 18 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1 | 201000024363 | Corrective |
| 06 Sept 2026 | 1 | 201000030840 | Corrective |
| 23 Aug 2026 | 4 | 201000013554 | Corrective |
| 23 Aug 2026 | 4 | 201000029373 | Corrective |
| 09 Aug 2026 | 2 | 201000030506 | Corrective |
| 31 Jul 2026 | 4 | 201000025825 | Corrective |
| 15 Jul 2026 | 1 | 201000039857 | Corrective |
| 14 Jul 2026 | 4 | 201000028281 | Corrective |
| 12 Jul 2026 | 2 | 201000021933 | Corrective |
| 07 Jul 2026 | 2 | 201000013665 | Corrective |
| 24 Jun 2026 | 2 | 209000014083 | Other maintenance |
| 21 Jun 2026 | 20 | 209000016742 | Other maintenance |
| 15 Jun 2026 | 6 | 204000004477 | Preventive |
| 13 Jun 2026 | 6 | 201000034439 | Corrective |
| 02 Jun 2026 | 3 | 201000022564 | Corrective |