ELBOW,45DEG,1/2IN,SCH40,SS316,BW

Material 4100029734 · ELBOW · Plant 1000

AReorderCriticalStockout
Material
4100029734
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 11 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
20 d · P80 21 d
Unit price
Rp 721,762

Recommendation

  • 1.Forecast 139 EA/year: 139 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~20 days; expected demand during lead time 7.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 31, order up to 85.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 85 now.
  • 5.Installed on 11 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
85 EA
Rp 61.3M · order by 01 Oct 2026
Expected arrival ≈ 20 days
ML early warningLast turnaround used 42Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
87 / 268
static parameters in BoM
Rec. Min (reorder point)
31
safety stock 24
Rec. Max
85
order qty 54
Service level
100.0%
stockout risk now 82%
Unit price
Rp 721,762
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 16 issue days in the last 180 days, last issue 1 days ago, 35 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (56 units) excluded from the baseline.

Demand pattern Smooth · 42 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 11 functional locations

3 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_8-CW-14050-A51A-T
PIPE-8 FROM PP-682A TO HE-1479B
A100.01
PX_1-1/2-QO-9219-A41A
PIPE-1-1/2 FROM VD-295 TO HE-289D
C100.01
PX_1-FG-3358-D12A-C
PIPE-1 FROM KC-223 TO PP-128A
C100.01
PX_12-DS-28981-A41A-T
PIPE-12 FROM HE-1221D TO VD-1338
C100.01
PX_3-P-28152-A22A-HS
PIPE-3 FROM HE-706A TO CL-658
C100.01
PX_3/4-CW-7128-C11A-H
PIPE-3/4 FROM PP-818 TO PP-1404A
C100.01
PX_6-CW-19529-A22A-H
PIPE-6 FROM CL-443 TO HE-397
C100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44
PX_BF-101
CRACKING FURNACE BF-101
S183.02

Lead time and procurement

Lead time 20 ± 10 days (PO history, 10 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR03
Regular replenishment
75Rp 725,85425 Sept 202618 d
30 Aug 2026PR03
Regular replenishment
117Rp 745,21514 Sept 202615 d
10 May 2026PR03
Regular replenishment
102Rp 708,58325 May 202615 d
21 Mar 2026PR03
Regular replenishment
111Rp 705,00303 Apr 202613 d
13 Feb 2026PR06
Regular replenishment
112Rp 717,66905 Mar 202620 d
13 Feb 2026PR03
Regular replenishment
54Rp 729,62701 Mar 202616 d
05 Jan 2026PR03
Regular replenishment
52Rp 743,68015 Jan 202610 d
02 Dec 2025PR01
Import / long-lead
87Rp 695,09726 Dec 202524 d
26 Oct 2025PR03
Regular replenishment
59Rp 738,85806 Dec 202541 d
03 Oct 2025PR03
Regular replenishment
61Rp 703,10619 Oct 202516 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202614201000000813Corrective
30 Sept 20261201000029668Corrective
20 Sept 20264201000026093Corrective
16 Sept 20261201000014062Corrective
09 Sept 20264201000030902Corrective
05 Sept 20261201000030840Corrective
04 Sept 20264203000008243Turnaround
31 Aug 20261201000017833Corrective
21 Aug 20264201000013554Corrective
19 Aug 20265201000002228Corrective
05 Aug 20265201000033991Corrective
26 Jun 202630209000028044Other maintenance
12 Jun 20261201000016926Corrective
03 Jun 20268201000031385Corrective
29 May 20264201000000267Corrective