ELBOW,45DEG,1/2IN,SCH40,SS316,BW
Material 4100029734 · ELBOW · Plant 1000
AReorderCriticalStockout
- Material
- 4100029734
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 11 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 20 d · P80 21 d
- Unit price
- Rp 721,762
Recommendation
- 1.Forecast 139 EA/year: 139 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~20 days; expected demand during lead time 7.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 31, order up to 85.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 85 now.
- 5.Installed on 11 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
85 EA
Rp 61.3M · order by 01 Oct 2026
Expected arrival ≈ 20 days
ML early warningLast turnaround used 42Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
87 / 268
static parameters in BoM
Rec. Min (reorder point)
31
safety stock 24
Rec. Max
85
order qty 54
Service level
100.0%
stockout risk now 82%
Unit price
Rp 721,762
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 16 issue days in the last 180 days, last issue 1 days ago, 35 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (56 units) excluded from the baseline.
Demand pattern Smooth · 42 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 11 functional locations
3 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_8-CW-14050-A51A-T PIPE-8 FROM PP-682A TO HE-1479B | A | 1 | 0 | 0.01 |
| PX_1-1/2-QO-9219-A41A PIPE-1-1/2 FROM VD-295 TO HE-289D | C | 1 | 0 | 0.01 |
| PX_1-FG-3358-D12A-C PIPE-1 FROM KC-223 TO PP-128A | C | 1 | 0 | 0.01 |
| PX_12-DS-28981-A41A-T PIPE-12 FROM HE-1221D TO VD-1338 | C | 1 | 0 | 0.01 |
| PX_3-P-28152-A22A-HS PIPE-3 FROM HE-706A TO CL-658 | C | 1 | 0 | 0.01 |
| PX_3/4-CW-7128-C11A-H PIPE-3/4 FROM PP-818 TO PP-1404A | C | 1 | 0 | 0.01 |
| PX_6-CW-19529-A22A-H PIPE-6 FROM CL-443 TO HE-397 | C | 1 | 0 | 0.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
Lead time and procurement
Lead time 20 ± 10 days (PO history, 10 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Sept 2026 | PR03 Regular replenishment | 75 | Rp 725,854 | 25 Sept 2026 | 18 d |
| 30 Aug 2026 | PR03 Regular replenishment | 117 | Rp 745,215 | 14 Sept 2026 | 15 d |
| 10 May 2026 | PR03 Regular replenishment | 102 | Rp 708,583 | 25 May 2026 | 15 d |
| 21 Mar 2026 | PR03 Regular replenishment | 111 | Rp 705,003 | 03 Apr 2026 | 13 d |
| 13 Feb 2026 | PR06 Regular replenishment | 112 | Rp 717,669 | 05 Mar 2026 | 20 d |
| 13 Feb 2026 | PR03 Regular replenishment | 54 | Rp 729,627 | 01 Mar 2026 | 16 d |
| 05 Jan 2026 | PR03 Regular replenishment | 52 | Rp 743,680 | 15 Jan 2026 | 10 d |
| 02 Dec 2025 | PR01 Import / long-lead | 87 | Rp 695,097 | 26 Dec 2025 | 24 d |
| 26 Oct 2025 | PR03 Regular replenishment | 59 | Rp 738,858 | 06 Dec 2025 | 41 d |
| 03 Oct 2025 | PR03 Regular replenishment | 61 | Rp 703,106 | 19 Oct 2025 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 14 | 201000000813 | Corrective |
| 30 Sept 2026 | 1 | 201000029668 | Corrective |
| 20 Sept 2026 | 4 | 201000026093 | Corrective |
| 16 Sept 2026 | 1 | 201000014062 | Corrective |
| 09 Sept 2026 | 4 | 201000030902 | Corrective |
| 05 Sept 2026 | 1 | 201000030840 | Corrective |
| 04 Sept 2026 | 4 | 203000008243 | Turnaround |
| 31 Aug 2026 | 1 | 201000017833 | Corrective |
| 21 Aug 2026 | 4 | 201000013554 | Corrective |
| 19 Aug 2026 | 5 | 201000002228 | Corrective |
| 05 Aug 2026 | 5 | 201000033991 | Corrective |
| 26 Jun 2026 | 30 | 209000028044 | Other maintenance |
| 12 Jun 2026 | 1 | 201000016926 | Corrective |
| 03 Jun 2026 | 8 | 201000031385 | Corrective |
| 29 May 2026 | 4 | 201000000267 | Corrective |