ELBOW,45DEG,1/4IN,SCH40,A234WPB,SW
Material 4100029750 · ELBOW · Plant 1000
AReorderCriticalStockout
- Material
- 4100029750
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 10 FuncLocs A/B)
- Supplier
- DUTA UTAMA PERSADA PT
- Lead time
- 30 d · P80 39 d
- Unit price
- Rp 954,418
Recommendation
- 1.Forecast 71 EA/year: 71 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~30 days; expected demand during lead time 5.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 25, order up to 59.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 59 now.
- 5.Installed on 10 FuncLoc(s), 2 of them criticality A/B.
- 6.ML early warning: 98% probability of demand in the next 90 days.
Proposed purchase requisition
59 EA
Rp 56.3M · order by 01 Oct 2026
Expected arrival ≈ 30 days
ML early warningLast turnaround used 28Single sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
25
safety stock 20
Rec. Max
59
order qty 34
Service level
100.0%
stockout risk now 81%
Unit price
Rp 954,418
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 5 days ago, 59 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Lumpy · 29 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 10 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_1-1/2-MS-18355-C11A-C PIPE-1-1/2 FROM PP-1952C TO KC-137A | C | 1 | 1 | 0.01 |
| PX_1-1/2-MS-8612-A51A-HS PIPE-1-1/2 FROM HE-234C TO PP-1830B | C | 1 | 0 | 0.01 |
| PX_1-CW-12583-A21A-HS PIPE-1 FROM VD-575 TO HE-1934D | C | 1 | 0 | 0.01 |
| PX_1-IA-1276-D12A-HS PIPE-1 FROM VD-671A TO PP-953A | C | 1 | 0 | 0.01 |
| PX_20-P-2860-A51A PIPE->16 FROM VD-785B TO PP-1830B | C | 1 | 0 | 0.01 |
| PX_3/4-HS-2612-B22A-T PIPE-3/4 FROM VD-240B TO KC-264A | C | 1 | 0 | 0.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 1 | 41 | 14.58 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 30 ± 14 days (PO history, 11 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Aug 2026 | PR03 Regular replenishment | 74 | Rp 954,418 | 05 Sept 2026 | 34 d |
| 19 Jun 2026 | PR06 Regular replenishment | 34 | Rp 934,956 | 04 Jul 2026 | 15 d |
| 25 Apr 2026 | PR03 Regular replenishment | 39 | Rp 937,501 | 20 Jun 2026 | 56 d |
| 08 Apr 2026 | PR06 Regular replenishment | 23 | Rp 965,401 | 26 Apr 2026 | 18 d |
| 19 Feb 2026 | PR06 Regular replenishment | 28 | Rp 982,956 | 13 Mar 2026 | 22 d |
| 20 Dec 2025 | PR03 Regular replenishment | 26 | Rp 940,376 | 11 Jan 2026 | 22 d |
| 09 Oct 2025 | PR06 Regular replenishment | 24 | Rp 969,142 | 01 Nov 2025 | 23 d |
| 02 Sept 2025 | PR03 Regular replenishment | 29 | Rp 1.0M | 03 Oct 2025 | 31 d |
| 25 Jul 2025 | PR03 Regular replenishment | 34 | Rp 939,220 | 16 Sept 2025 | 53 d |
| 13 Jun 2025 | PR03 Regular replenishment | 71 | Rp 940,165 | 15 Jul 2025 | 32 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 10 | 209000029477 | Other maintenance |
| 24 Sept 2026 | 12 | 209000029477 | Other maintenance |
| 10 Sept 2026 | 4 | 201000013299 | Corrective |
| 05 Aug 2026 | 2 | 205000008171 | Other maintenance |
| 26 Jul 2026 | 5 | 201000002237 | Corrective |
| 14 Jun 2026 | 3 | 204000004477 | Preventive |
| 11 Jun 2026 | 5 | 201000028320 | Corrective |
| 28 Jan 2026 | 1 | 201000036335 | Corrective |
| 08 Jan 2026 | 3 | 201000024572 | Corrective |
| 07 Jan 2026 | 6 | 203000006950 | Turnaround |
| 31 Dec 2025 | 6 | 203000036428 | Turnaround |
| 28 Dec 2025 | 4 | 203000006078 | Turnaround |
| 25 Dec 2025 | 2 | 201000003889 | Corrective |
| 25 Dec 2025 | 4 | 201000023356 | Corrective |
| 10 Dec 2025 | 1 | 201000026704 | Corrective |