ELBOW,90DEG,3/4IN,SCH40,A234WPB,BW
Material 4100029756 · ELBOW · Plant 1000
BReduceExcess
- Material
- 4100029756
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 4 FuncLocs A/B)
- Supplier
- MEGA TEKNOLOGI SENTOSA PT
- Lead time
- 43 d · P80 59 d
- Unit price
- Rp 33,080
Recommendation
- 1.Forecast 48 EA/year: 48 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~43 days; expected demand during lead time 5.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 70.
- 4.Stock 620 exceeds the level to keep (70) by 550.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 98% probability of demand in the next 90 days.
ML early warningLast turnaround used 10Single sourceAbnormal consumption
On hand / on order
620 / 0
no open PO
Today Min / Max
76 / 129
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 17
Rec. Max
70
order qty 48
Service level
99.9%
stockout risk now 0%
Unit price
Rp 33,080
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 52 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (12 units) excluded from the baseline.
Demand pattern Lumpy · 25 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-HS-3852-A11A-T PIPE-1-1/2 FROM PP-606D TO PP-1770 | B | 1 | 0 | 0.01 |
| PX_28-MS-14786-D12A-H PIPE->16 FROM HE-952C TO KC-854C | C | 1 | 0 | 0.01 |
| PX_3-HS-9196-B23A-HS PIPE-3 FROM HE-1564C TO VD-383 | C | 1 | 0 | 0.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 43 ± 24 days (PO history, 10 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Aug 2026 | PR03 Regular replenishment | 39 | Rp 34,400 | 21 Sept 2026 | 25 d |
| 11 Jul 2026 | PR03 Regular replenishment | 41 | Rp 32,267 | 06 Sept 2026 | 57 d |
| 08 May 2026 | PR06 Regular replenishment | 29 | Rp 32,876 | 22 Jun 2026 | 45 d |
| 21 Mar 2026 | PR03 Regular replenishment | 45 | Rp 32,895 | 01 May 2026 | 41 d |
| 16 Mar 2026 | PR03 Regular replenishment | 18 | Rp 33,676 | 13 Apr 2026 | 28 d |
| 26 Oct 2025 | PR03 Regular replenishment | 30 | Rp 33,066 | 02 Jan 2026 | 68 d |
| 16 Oct 2025 | PR03 Regular replenishment | 35 | Rp 34,148 | 13 Nov 2025 | 28 d |
| 17 Jul 2025 | PR06 Regular replenishment | 43 | Rp 33,094 | 25 Aug 2025 | 39 d |
| 07 Jul 2025 | PR03 Regular replenishment | 45 | Rp 32,615 | 18 Aug 2025 | 42 d |
| 17 May 2025 | PR03 Regular replenishment | 21 | Rp 33,555 | 12 Sept 2025 | 118 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
| 04 Jul 2026 | High | PX_BF-108 | Install scaffolding at BF-108 |
| 04 Jul 2026 | Medium | PX_BF-108 | Leak from packing |
| 16 Jun 2026 | High | PX_BF-108 | Leak from packing |
| 03 May 2026 | Medium | PX_BF-108 | Replace burner tip BF-108 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Aug 2026 | 6 | 201000035120 | Corrective |
| 01 Aug 2026 | 1 | 201000026506 | Corrective |
| 16 Jul 2026 | 1 | 201000037405 | Corrective |
| 30 Jun 2026 | 6 | 209000022177 | Other maintenance |
| 24 Jun 2026 | 2 | 209000027470 | Other maintenance |
| 14 May 2026 | 2 | 201000005745 | Corrective |
| 07 May 2026 | 4 | 201000028932 | Corrective |
| 09 Apr 2026 | 2 | 201000001052 | Corrective |
| 22 Jan 2026 | 1 | 201000008172 | Corrective |
| 10 Jan 2026 | 4 | 201000014667 | Corrective |
| 28 Dec 2025 | 6 | 203000016277 | Turnaround |
| 27 Dec 2025 | 1 | 201000019463 | Corrective |
| 21 Dec 2025 | 6 | 201000013618 | Corrective |
| 15 Dec 2025 | 5 | 201000013375 | Corrective |
| 11 Dec 2025 | 10 | 201000014152 | Corrective |