Sparely
DU

ELBOW,90DEG,3/4IN,SCH40,A234WPB,BW

Material 4100029756 · ELBOW · Plant 1000

BReduceExcess
Material
4100029756
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
MEGA TEKNOLOGI SENTOSA PT
Lead time
43 d · P80 59 d
Unit price
Rp 33,080

Recommendation

  • 1.Forecast 48 EA/year: 48 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~43 days; expected demand during lead time 5.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 70.
  • 4.Stock 620 exceeds the level to keep (70) by 550.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 98% probability of demand in the next 90 days.
ML early warningLast turnaround used 10Single sourceAbnormal consumption
On hand / on order
620 / 0
no open PO
Today Min / Max
76 / 129
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 17
Rec. Max
70
order qty 48
Service level
99.9%
stockout risk now 0%
Unit price
Rp 33,080
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 52 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Lumpy · 25 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-HS-3852-A11A-T
PIPE-1-1/2 FROM PP-606D TO PP-1770
B100.01
PX_28-MS-14786-D12A-H
PIPE->16 FROM HE-952C TO KC-854C
C100.01
PX_3-HS-9196-B23A-HS
PIPE-3 FROM HE-1564C TO VD-383
C100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 43 ± 24 days (PO history, 10 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR03
Regular replenishment
39Rp 34,40021 Sept 202625 d
11 Jul 2026PR03
Regular replenishment
41Rp 32,26706 Sept 202657 d
08 May 2026PR06
Regular replenishment
29Rp 32,87622 Jun 202645 d
21 Mar 2026PR03
Regular replenishment
45Rp 32,89501 May 202641 d
16 Mar 2026PR03
Regular replenishment
18Rp 33,67613 Apr 202628 d
26 Oct 2025PR03
Regular replenishment
30Rp 33,06602 Jan 202668 d
16 Oct 2025PR03
Regular replenishment
35Rp 34,14813 Nov 202528 d
17 Jul 2025PR06
Regular replenishment
43Rp 33,09425 Aug 202539 d
07 Jul 2025PR03
Regular replenishment
45Rp 32,61518 Aug 202542 d
17 May 2025PR03
Regular replenishment
21Rp 33,55512 Sept 2025118 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing
03 May 2026MediumPX_BF-108Replace burner tip BF-108

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20266201000035120Corrective
01 Aug 20261201000026506Corrective
16 Jul 20261201000037405Corrective
30 Jun 20266209000022177Other maintenance
24 Jun 20262209000027470Other maintenance
14 May 20262201000005745Corrective
07 May 20264201000028932Corrective
09 Apr 20262201000001052Corrective
22 Jan 20261201000008172Corrective
10 Jan 20264201000014667Corrective
28 Dec 20256203000016277Turnaround
27 Dec 20251201000019463Corrective
21 Dec 20256201000013618Corrective
15 Dec 20255201000013375Corrective
11 Dec 202510201000014152Corrective