ELBOW,45DEG,12IN,SCH40,A234WPB,SW
Material 4100029788 · ELBOW · Plant 1000
AReduceExcess
- Material
- 4100029788
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 29 d · P80 35 d
- Unit price
- Rp 109,373
Recommendation
- 1.Forecast 53 EA/year: 53 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~29 days; expected demand during lead time 4.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 22, order up to 76.
- 4.Stock 80 exceeds the level to keep (76) by 4.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 90% probability of demand in the next 90 days.
ML early warningLast turnaround used 22Single sourceAbnormal consumptionOpen PO
On hand / on order
80 / 95
next delivery 03 Oct 2026
Today Min / Max
24 / 48
static parameters in BoM
Rec. Min (reorder point)
22
safety stock 18
Rec. Max
76
order qty 54
Service level
100.0%
stockout risk now 0%
Unit price
Rp 109,373
PO history
ML early warning: 90% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 14 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Lumpy · 20 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 5 functional locations
3 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_3/4-DS-10122-B21A PIPE-3/4 FROM VD-379 TO PP-744B | B | 4 | 0 | 0.01 |
| PX_1-IA-7369-B23A PIPE-1 FROM PP-315A TO HE-1647D | C | 1 | 1 | 0.44 |
| PX_12-QO-3815-B23A-C PIPE-12 FROM PP-614 TO PP-1834B | C | 1 | 1 | 0.01 |
Lead time and procurement
Lead time 29 ± 24 days (PO history, 12 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Sept 2026 | PR05 Project / turnaround | 36 | Rp 107,707 | 03 Oct 2026 open | 23 d |
| 05 Sept 2026 | PR03 Regular replenishment | 59 | Rp 109,193 | 13 Oct 2026 open | 38 d |
| 06 Jun 2026 | PR03 Regular replenishment | 51 | Rp 105,794 | 23 Jun 2026 | 17 d |
| 12 May 2026 | PR05 Project / turnaround | 62 | Rp 110,820 | 21 Aug 2026 | 101 d |
| 29 Apr 2026 | PR06 Regular replenishment | 57 | Rp 110,357 | 20 May 2026 | 21 d |
| 20 Apr 2026 | PR03 Regular replenishment | 51 | Rp 109,553 | 01 May 2026 | 11 d |
| 15 Feb 2026 | PR03 Regular replenishment | 40 | Rp 110,532 | 27 Feb 2026 | 12 d |
| 06 Feb 2026 | PR05 Project / turnaround | 35 | Rp 110,187 | 10 Apr 2026 | 63 d |
| 29 Jan 2026 | PR06 Regular replenishment | 43 | Rp 110,503 | 18 Feb 2026 | 20 d |
| 17 Jan 2026 | PR03 Regular replenishment | 66 | Rp 108,377 | 04 Feb 2026 | 18 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Sept 2026 | 1 | 201000002599 | Corrective |
| 28 Aug 2026 | 2 | 201000033538 | Corrective |
| 11 Apr 2026 | 2 | 201000037398 | Corrective |
| 20 Feb 2026 | 1 | 201000028494 | Corrective |
| 10 Feb 2026 | 1 | 201000027136 | Corrective |
| 12 Jan 2026 | 2 | 201000032767 | Corrective |
| 06 Jan 2026 | 1 | 201000020180 | Corrective |
| 28 Dec 2025 | 18 | 203000006078 | Turnaround |
| 22 Dec 2025 | 8 | 201000008288 | Corrective |
| 15 Dec 2025 | 4 | 201000004998 | Corrective |
| 03 Dec 2025 | 13 | 204000026193 | Preventive |
| 28 Nov 2025 | 2 | 203000009623 | Turnaround |
| 24 Nov 2025 | 1 | 201000025614 | Corrective |
| 22 Nov 2025 | 1 | 201000004704 | Corrective |
| 10 Nov 2025 | 2 | 201000024097 | Corrective |