ELBOW,90DEG,10IN,SCH80,SS316,BW

Material 4100029808 · ELBOW · Plant 1000

CMaintainStockout
Material
4100029808
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 4 FuncLocs A/B)
Supplier
GUNUNG INDUSTRI PRATAMA PT
Lead time
41 d · P80 61 d
Unit price
Rp 959,244

Recommendation

  • 1.Forecast 48 EA/year: 48 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~41 days; expected demand during lead time 5.3.
  • 3.A 95.7% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 41.
  • 4.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 8Single sourceOpen PO
On hand / on order
0 / 77
next delivery 09 Oct 2026
Today Min / Max
10 / 17
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 8
Rec. Max
41
order qty 28
Service level
95.7%
stockout risk now 0%
Unit price
Rp 959,244
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 9 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (24 units) excluded from the baseline.

Demand pattern Lumpy · 19 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 72.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.

Installed on 4 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-FG-10662-D12A
PIPE-2 FROM KC-224A TO PP-1303
C300.01
PX_20-QO-1798-B22A-C
PIPE->16 FROM HE-1479B TO HE-1473C
C100.01
PX_3/4-CW-5168-A11A-HS
PIPE-3/4 FROM PP-1638B TO PP-703B
C100.01
PX_3/4-HS-2049-A51A
PIPE-3/4 FROM KC-236B TO VD-1976
C100.01

Lead time and procurement

Lead time 41 ± 17 days (PO history, 8 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
21 Sept 2026PR05
Project / turnaround
48Rp 973,23411 Nov 2026
open
51 d
18 Aug 2026PR06
Regular replenishment
29Rp 927,44709 Oct 2026
open
52 d
11 Apr 2026PR04
Regular (other)
21Rp 1.0M09 May 202628 d
11 Feb 2026PR03
Regular replenishment
20Rp 996,10406 Mar 202623 d
27 Jan 2026PR03
Regular replenishment
47Rp 922,90312 Apr 202675 d
01 Jan 2026PR03
Regular replenishment
27Rp 940,20609 Mar 202667 d
28 Oct 2025PR06
Regular replenishment
15Rp 945,25305 Dec 202538 d
20 Jun 2025PR03
Regular replenishment
48Rp 999,71304 Aug 202545 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
22 Sept 20263201000010227Corrective
22 Sept 20261204000002989Preventive
26 Jul 20261201000003691Corrective
22 Jun 20266209000014083Other maintenance
14 Jun 20262204000004477Preventive
09 Jun 20261201000034416Corrective
13 Apr 20266201000001324Corrective
17 Feb 20267201000036556Corrective
29 Jan 20264201000004187Corrective
24 Jan 202614201000028000Corrective
14 Jan 20261201000034958Corrective
03 Jan 20266201000034626Corrective
30 Dec 20252203000036002Turnaround
29 Nov 20254203000012255Turnaround
18 Nov 20256201000002034Corrective