ELBOW,90DEG,10IN,SCH80,SS316,BW
Material 4100029808 · ELBOW · Plant 1000
CMaintainStockout
- Material
- 4100029808
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 4 FuncLocs A/B)
- Supplier
- GUNUNG INDUSTRI PRATAMA PT
- Lead time
- 41 d · P80 61 d
- Unit price
- Rp 959,244
Recommendation
- 1.Forecast 48 EA/year: 48 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~41 days; expected demand during lead time 5.3.
- 3.A 95.7% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 41.
- 4.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 8Single sourceOpen PO
On hand / on order
0 / 77
next delivery 09 Oct 2026
Today Min / Max
10 / 17
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 8
Rec. Max
41
order qty 28
Service level
95.7%
stockout risk now 0%
Unit price
Rp 959,244
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 9 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (24 units) excluded from the baseline.
Demand pattern Lumpy · 19 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 72.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.
Installed on 4 functional locations
0 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-FG-10662-D12A PIPE-2 FROM KC-224A TO PP-1303 | C | 3 | 0 | 0.01 |
| PX_20-QO-1798-B22A-C PIPE->16 FROM HE-1479B TO HE-1473C | C | 1 | 0 | 0.01 |
| PX_3/4-CW-5168-A11A-HS PIPE-3/4 FROM PP-1638B TO PP-703B | C | 1 | 0 | 0.01 |
| PX_3/4-HS-2049-A51A PIPE-3/4 FROM KC-236B TO VD-1976 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 41 ± 17 days (PO history, 8 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2026 | PR05 Project / turnaround | 48 | Rp 973,234 | 11 Nov 2026 open | 51 d |
| 18 Aug 2026 | PR06 Regular replenishment | 29 | Rp 927,447 | 09 Oct 2026 open | 52 d |
| 11 Apr 2026 | PR04 Regular (other) | 21 | Rp 1.0M | 09 May 2026 | 28 d |
| 11 Feb 2026 | PR03 Regular replenishment | 20 | Rp 996,104 | 06 Mar 2026 | 23 d |
| 27 Jan 2026 | PR03 Regular replenishment | 47 | Rp 922,903 | 12 Apr 2026 | 75 d |
| 01 Jan 2026 | PR03 Regular replenishment | 27 | Rp 940,206 | 09 Mar 2026 | 67 d |
| 28 Oct 2025 | PR06 Regular replenishment | 15 | Rp 945,253 | 05 Dec 2025 | 38 d |
| 20 Jun 2025 | PR03 Regular replenishment | 48 | Rp 999,713 | 04 Aug 2025 | 45 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Sept 2026 | 3 | 201000010227 | Corrective |
| 22 Sept 2026 | 1 | 204000002989 | Preventive |
| 26 Jul 2026 | 1 | 201000003691 | Corrective |
| 22 Jun 2026 | 6 | 209000014083 | Other maintenance |
| 14 Jun 2026 | 2 | 204000004477 | Preventive |
| 09 Jun 2026 | 1 | 201000034416 | Corrective |
| 13 Apr 2026 | 6 | 201000001324 | Corrective |
| 17 Feb 2026 | 7 | 201000036556 | Corrective |
| 29 Jan 2026 | 4 | 201000004187 | Corrective |
| 24 Jan 2026 | 14 | 201000028000 | Corrective |
| 14 Jan 2026 | 1 | 201000034958 | Corrective |
| 03 Jan 2026 | 6 | 201000034626 | Corrective |
| 30 Dec 2025 | 2 | 203000036002 | Turnaround |
| 29 Nov 2025 | 4 | 203000012255 | Turnaround |
| 18 Nov 2025 | 6 | 201000002034 | Corrective |