ELBOW,45DEG,4IN,3000#,A234WPB,SW
Material 4100029830 · ELBOW · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100029830
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 24 d · P80 26 d
- Unit price
- Rp 49,433
Recommendation
- 1.Forecast 46 EA/year: 46 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~24 days; expected demand during lead time 3.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 19, order up to 66.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 63 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 95% probability of demand in the next 90 days.
Proposed purchase requisition
63 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 24 days
ML early warningLast turnaround used 2Single sourceAbnormal consumption
On hand / on order
3 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
19
safety stock 16
Rec. Max
66
order qty 47
Service level
100.0%
stockout risk now 56%
Unit price
Rp 49,433
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 6 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Intermittent · 21 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_1-LS-20681-A11A PIPE-1 FROM HE-966 TO PP-1765B | C | 1 | 1 | 0.01 |
| PX_6-P-28777-A21A-HS PIPE-6 FROM HE-162 TO HE-1361C | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 12 days (PO history, 11 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jul 2026 | PR05 Project / turnaround | 29 | Rp 49,794 | 17 Aug 2026 | 26 d |
| 14 Jun 2026 | PR06 Regular replenishment | 25 | Rp 51,006 | 07 Jul 2026 | 23 d |
| 12 Jun 2026 | PR03 Regular replenishment | 15 | Rp 49,302 | 06 Jul 2026 | 24 d |
| 10 Jun 2026 | PR06 Regular replenishment | 31 | Rp 48,443 | 26 Jun 2026 | 16 d |
| 28 May 2026 | PR03 Regular replenishment | 39 | Rp 49,399 | 15 Jun 2026 | 18 d |
| 19 Apr 2026 | PR03 Regular replenishment | 38 | Rp 49,433 | 08 May 2026 | 19 d |
| 25 Mar 2026 | PR04 Regular (other) | 32 | Rp 47,669 | 30 Apr 2026 | 36 d |
| 03 Feb 2026 | PR03 Regular replenishment | 32 | Rp 50,587 | 16 Feb 2026 | 13 d |
| 21 Jan 2026 | PR03 Regular replenishment | 29 | Rp 49,588 | 15 Feb 2026 | 25 d |
| 18 Sept 2025 | PR03 Regular replenishment | 27 | Rp 49,650 | 03 Oct 2025 | 15 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 15 Aug 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 08 Aug 2026 | Low | PX_BF-107 | Cleaning burner BF-107 |
| 21 Jul 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 21 Jul 2026 | Medium | PX_BF-107 | Thermograph wall BF-107 |
| 18 Jul 2026 | Emergency | PX_BF-107 | Hot spot at convection BF-107 |
| 10 Jul 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 12 Apr 2026 | Medium | PX_BF-107 | Decoking follow up BF-107 |
| 07 Mar 2026 | Medium | PX_BF-107 | Thermograph wall BF-107 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Sept 2026 | 7 | 201000003956 | Corrective |
| 14 Sept 2026 | 2 | 209000036917 | Other maintenance |
| 12 Aug 2026 | 6 | 201000031702 | Corrective |
| 24 Jul 2026 | 1 | 201000001320 | Corrective |
| 30 Jan 2026 | 3 | 201000024383 | Corrective |
| 23 Jan 2026 | 3 | 201000036700 | Corrective |
| 22 Jan 2026 | 2 | 201000015024 | Corrective |
| 15 Jan 2026 | 2 | 201000037994 | Corrective |
| 29 Dec 2025 | 2 | 203000006078 | Turnaround |
| 28 Dec 2025 | 4 | 201000013646 | Corrective |
| 22 Dec 2025 | 1 | 201000025698 | Corrective |
| 11 Dec 2025 | 4 | 201000016602 | Corrective |
| 05 Dec 2025 | 12 | 201000018271 | Corrective |
| 14 Oct 2025 | 4 | 201000010345 | Corrective |
| 06 Sept 2025 | 7 | 201000005764 | Corrective |