Sparely
DU

ELBOW,90DEG,1/4IN,3000#,A105,SW

Material 4100029863 · ELBOW · Plant 1000

BReduceNon-moving
Material
4100029863
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 219,925 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
  • 4.Stock 576 exceeds the level to keep (5) by 571.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
576 / 0
no open PO
Today Min / Max
10 / 20
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 133,669/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 4 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_12-BF-24554-A11A-HS
PIPE-12 FROM HE-530D TO PP-688
B100.01
PX_1-QO-23198-A51A-C
PIPE-1 FROM PP-1171 TO PP-1115
C100.01
PX_28-MS-3136-D12A-T
PIPE->16 FROM HE-113D TO PP-383
C100.01
PX_6-HS-10663-A22A-H
PIPE-6 FROM KC-155D TO PP-800
C300.01

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.