ELBOW,90DEG,1/2IN,SCH40,A234WPB,BW

Material 4100029933 · ELBOW · Plant 1000

AReorderNormalBelow reorder point
Material
4100029933
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 219,925 (est.)

Recommendation

  • 1.Forecast 8.0 EA/year: 8.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 13.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 2.2M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
13
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 11 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 3 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A32811.58
PX_6-P-15791-B21A-HS
PIPE-6 FROM CL-1871 TO PP-818B
C100.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
11 Sept 2026MediumPX_BF-110Leak from packing
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110

Recent goods issues

Posting dateQtyOrderOrder type
20 Sept 20261201000022167Corrective