ELBOW,90DEG,4IN,3000#,A234WPB,BW
Material 4100029942 · ELBOW · Plant 1000
CReducePotentially obsolete
- Material
- 4100029942
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 41 d
- Unit price
- Rp 219,925 (est.)
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.0.
- 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
- 4.Stock 144 exceeds the level to keep (5) by 139.
Price estimatedLead time estimated
On hand / on order
144 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
99.2%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 788,027/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.
Installed on 6 functional locations
0 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-HS-11650-A11A-C PIPE-1-1/2 FROM VD-1001 TO BF-105 | C | 1 | 0 | 0.01 |
| PX_1-1/2-QO-9219-A41A PIPE-1-1/2 FROM VD-295 TO HE-289D | C | 1 | 0 | 0.01 |
| PX_2-IA-23649-A21A-T PIPE-2 FROM PP-210A TO PP-1834B | C | 1 | 0 | 0.01 |
| PX_3/4-FG-25152-A11A-T PIPE-3/4 FROM PP-336A TO PP-700 | C | 1 | 0 | 0.01 |
| PX_3/4-QO-5881-C11A-H PIPE-3/4 FROM BF-111 TO VD-474 | C | 1 | 0 | 0.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 27 Nov 2025 | Medium | PX_BF-101 | Peep door broken BF-101 |
| 15 Oct 2025 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 13 Aug 2025 | Emergency | PX_BF-101 | Leak from packing |
| 02 Jun 2025 | Low | PX_BF-101 | Install cover plate BF-101 |
Recent goods issues
Never issued in the 17-month history.