ELBOW,90DEG,4IN,3000#,A234WPB,BW

Material 4100029942 · ELBOW · Plant 1000

CReducePotentially obsolete
Material
4100029942
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 219,925 (est.)

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
  • 4.Stock 144 exceeds the level to keep (5) by 139.
Price estimatedLead time estimated
On hand / on order
144 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
99.2%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 788,027/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.

Installed on 6 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-HS-11650-A11A-C
PIPE-1-1/2 FROM VD-1001 TO BF-105
C100.01
PX_1-1/2-QO-9219-A41A
PIPE-1-1/2 FROM VD-295 TO HE-289D
C100.01
PX_2-IA-23649-A21A-T
PIPE-2 FROM PP-210A TO PP-1834B
C100.01
PX_3/4-FG-25152-A11A-T
PIPE-3/4 FROM PP-336A TO PP-700
C100.01
PX_3/4-QO-5881-C11A-H
PIPE-3/4 FROM BF-111 TO VD-474
C100.01
PX_BF-101
CRACKING FURNACE BF-101
S183.02

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing
02 Jun 2025LowPX_BF-101Install cover plate BF-101

Recent goods issues

Never issued in the 17-month history.