ELBOW,45DEG,12IN,3000#,SS316,SW

Material 4100029976 · ELBOW · Plant 1000

AReorderCriticalStockout
Material
4100029976
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
24 d · P80 41 d
Unit price
Rp 46,480

Recommendation

  • 1.Forecast 16 EA/year: 16 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 1.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 22.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 22 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
22 EA
Rp 1.0M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
22
order qty 16
Service level
99.9%
stockout risk now 50%
Unit price
Rp 46,480
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 93 days ago, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_3/4-FG-3567-A11A-T
PIPE-3/4 FROM PP-1011D TO VD-462
A100.01
PX_12-BF-24554-A11A-HS
PIPE-12 FROM HE-530D TO PP-688
B100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 24 ± 13 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
23 Nov 2025PR03
Regular replenishment
2Rp 46,48017 Dec 202524 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
07 Sept 2026MediumPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20262201000031423Corrective
06 Aug 20251201000019352Corrective