ELBOW,90DEG,3IN,3000#,A234WPB,SW
Material 4100030039 · ELBOW · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100030039
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 41 d
- Unit price
- Rp 219,925 (est.)
Recommendation
- 1.Forecast 9.0 EA/year: 9.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 18.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
13 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
18
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 40 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 568.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 3 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 3 | 23 | 9.01 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
Recent goods issues
Never issued in the 17-month history.