ELBOW,90DEG,1/2IN,3000#,A105,BW

Material 4100030144 · ELBOW · Plant 1000

AMonitorCritical insurance spare
Material
4100030144
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 219,925 (est.)

Recommendation

  • 1.Forecast 3.1 EA/year: 3.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 14.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
14
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 14 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 192.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_3-IA-28262-B22A-C
PIPE-3 FROM PP-1155C TO HE-308C
C110.01
PX_2-BF-16657-A41A-T
PIPE-2 FROM HE-754 TO CL-121
C100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
07 Sept 2026MediumPX_BF-108Leak from packing
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
27 Jul 2026LowPX_BF-108Cleaning burner BF-108

Recent goods issues

Never issued in the 17-month history.