ELBOW,45DEG,6IN,SCH80,SS316,SW

Material 4100030192 · ELBOW · Plant 1000

CMonitorSlow-moving
Material
4100030192
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
25 d · P80 41 d
Unit price
Rp 395,054

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~25 days; expected demand during lead time 0.1.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 6.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
6
order qty 6
Service level
98.8%
stockout risk now 1%
Unit price
Rp 395,054
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 294 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-IA-10141-A22A-HS
PIPE-3/4 FROM HE-528A TO PP-1063
C100.01

Lead time and procurement

Lead time 25 ± 13 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jan 2026PR03
Regular replenishment
2Rp 395,05402 Feb 202626 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
11 Dec 20256201000020533Corrective