ELBOW,90DEG,12IN,SCH40,A234WPB,BW
Material 4100030329 · ELBOW · Plant 1000
SReducePotentially obsolete
- Material
- 4100030329
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PRIMA LOGAM NUSANTARA PT
- Lead time
- 19 d · P80 14 d
- Unit price
- Rp 219,925
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~19 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 23 exceeds the level to keep (0) by 23.
Convert to Non StockSingle source
On hand / on order
23 / 0
no open PO
Today Min / Max
10 / 24
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 219,925
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 224,224/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~12 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
Lead time and procurement
Lead time 19 ± 7 days (PO history, 3 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 May 2026 | PR03 Regular replenishment | 2 | Rp 219,972 | 14 May 2026 | 13 d |
| 12 Feb 2026 | PR03 Regular replenishment | 1 | Rp 207,831 | 26 Feb 2026 | 14 d |
| 02 Jul 2025 | PR06 Regular replenishment | 1 | Rp 219,925 | 16 Jul 2025 | 14 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 27 Nov 2025 | Medium | PX_BF-101 | Peep door broken BF-101 |
| 15 Oct 2025 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 13 Aug 2025 | Emergency | PX_BF-101 | Leak from packing |
| 02 Jun 2025 | Low | PX_BF-101 | Install cover plate BF-101 |
Recent goods issues
Never issued in the 17-month history.