ELBOW,45DEG,6IN,SCH40,A105,BW
Material 4100030349 · ELBOW · Plant 1000
CReducePotentially obsolete
- Material
- 4100030349
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 41 d
- Unit price
- Rp 219,925 (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 8 exceeds the level to keep (0) by 8.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6,441/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.
Installed on 2 functional locations
0 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_10-P-18581-C11A-H PIPE-10 FROM KC-202 TO HE-1205D | C | 4 | 1 | 0.01 |
| PX_3/4-QO-13586-C11A PIPE-3/4 FROM VD-1756A TO HE-149A | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 May 2025 | Medium | PX_10-P-18581-C11A-H | PSM25/Replace pipe 10-P-18581-C11A-H |
Recent goods issues
Never issued in the 17-month history.