ELBOW,90DEG,2IN,SCH80,A234WPB,SW

Material 4100030519 · ELBOW · Plant 1000

BReorderCriticalStockout
Material
4100030519
Category
ELBOW
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 41 d
Unit price
Rp 219,925 (est.)

Recommendation

  • 1.Forecast 4.3 EA/year: 4.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 2.2M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.8%
stockout risk now 6%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 59.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-MS-3515-C11A-HS
PIPE-3/4 FROM KC-293B TO PP-1194B
B120.44
PX_3/4-LS-10065-A22A-H
PIPE-3/4 FROM HE-1547 TO VD-999
C100.01

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2025MediumPX_3/4-MS-3515-C11A-HSInstall cover plate for MCP cracking
28 May 2025LowPX_3/4-MS-3515-C11A-HSPSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
02 Jan 20268201000008767Corrective
10 Oct 20251201000002598Corrective
09 Oct 20252201000002598Corrective
09 Oct 20253201000002598Corrective