ELBOW,90DEG,2IN,SCH80,A234WPB,SW
Material 4100030519 · ELBOW · Plant 1000
BReorderCriticalStockout
- Material
- 4100030519
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 41 d
- Unit price
- Rp 219,925 (est.)
Recommendation
- 1.Forecast 4.3 EA/year: 4.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~24 days; expected demand during lead time 0.3.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 2.2M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.8%
stockout risk now 6%
Unit price
Rp 219,925
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 59.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-MS-3515-C11A-HS PIPE-3/4 FROM KC-293B TO PP-1194B | B | 1 | 2 | 0.44 |
| PX_3/4-LS-10065-A22A-H PIPE-3/4 FROM HE-1547 TO VD-999 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2025 | Medium | PX_3/4-MS-3515-C11A-HS | Install cover plate for MCP cracking |
| 28 May 2025 | Low | PX_3/4-MS-3515-C11A-HS | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jan 2026 | 8 | 201000008767 | Corrective |
| 10 Oct 2025 | 1 | 201000002598 | Corrective |
| 09 Oct 2025 | 2 | 201000002598 | Corrective |
| 09 Oct 2025 | 3 | 201000002598 | Corrective |