TEE,12IN,SCH80,A105,SW

Material 4100031185 · TEE · Plant 1000

BMonitorStockout
Material
4100031185
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 8 FuncLocs A/B)
Supplier
MEGA TEKNOLOGI SENTOSA PT
Lead time
43 d · P80 57 d
Unit price
Rp 235,868

Recommendation

  • 1.Forecast 170 EA/year: 170 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~43 days; expected demand during lead time 20.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 62, order up to 167.
  • 4.Installed on 8 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 60Single sourceAbnormal consumptionOpen PO
On hand / on order
0 / 326
next delivery 11 Oct 2026
Today Min / Max
251 / 644
static parameters in BoM
Rec. Min (reorder point)
62
safety stock 42
Rec. Max
167
order qty 105
Service level
99.9%
stockout risk now 0%
Unit price
Rp 235,868
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 18 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (100 units) excluded from the baseline.

Demand pattern Erratic · 64 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 8 functional locations

1 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_10-HS-10879-A11A-H
PIPE-10 FROM PP-1166B TO VD-148B
B200.01
PX_1-MS-29232-A41A
PIPE-1 FROM PP-489A TO PP-438B
C200.01
PX_12-P-14843-A11A-C
PIPE-12 FROM HE-786 TO PP-128A
C100.01
PX_2-CW-15806-B22A
PIPE-2 FROM PP-810A TO HE-1555A
C100.01
PX_2-P-1882-B21A
PIPE-2 FROM HE-605 TO HE-1473C
C100.01
PX_3/4-FG-26997-A51A-H
PIPE-3/4 FROM KC-464A TO CL-883
C100.01
PX_3/4-IA-15384-A41A
PIPE-3/4 FROM PP-1279 TO KC-235D
C200.01
PX_6-BF-24861-A51A-HS
PIPE-6 FROM KC-505D TO HE-1454B
C100.01

Lead time and procurement

Lead time 43 ± 15 days (PO history, 28 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR06
Regular replenishment
63Rp 239,00708 Nov 2026
open
58 d
05 Sept 2026PR03
Regular replenishment
108Rp 222,95211 Oct 2026
open
36 d
30 Aug 2026PR03
Regular replenishment
105Rp 235,13222 Sept 202623 d
20 Aug 2026PR03
Regular replenishment
155Rp 241,68505 Nov 2026
open
77 d
23 Jul 2026PR03
Regular replenishment
61Rp 232,17818 Sept 202657 d
19 Jul 2026PR03
Regular replenishment
119Rp 240,41714 Aug 202626 d
18 Jul 2026PR03
Regular replenishment
118Rp 240,83524 Aug 202637 d
14 Jul 2026PR03
Regular replenishment
67Rp 229,03910 Sept 202658 d
23 Jun 2026PR03
Regular replenishment
109Rp 235,52202 Aug 202640 d
16 Jun 2026PR03
Regular replenishment
164Rp 236,21319 Jul 202633 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20264201000025027Corrective
29 Sept 20265201000001687Corrective
25 Sept 20262201000025207Corrective
19 Sept 20264201000020281Corrective
06 Sept 20263201000030840Corrective
02 Sept 20265201000010492Corrective
31 Aug 202614203000017844Turnaround
18 Aug 20261201000024434Corrective
09 Aug 20261201000006061Corrective
30 Jul 20263201000033262Corrective
07 Jul 20261201000034569Corrective
28 Jun 20264201000002391Corrective
19 Jun 20268201000016917Corrective
18 Jun 20267201000017715Corrective
08 Jun 20265201000024387Corrective