TEE,1-1/2IN,SCH40,A105,BW
Material 4100031195 · TEE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100031195
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 9 FuncLocs A/B)
- Supplier
- ANUGRAH PERKASA MAKMUR PT
- Lead time
- 21 d · P80 24 d
- Unit price
- Rp 569,523
Recommendation
- 1.Forecast 91 EA/year: 91 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~21 days; expected demand during lead time 5.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 23, order up to 73.
- 4.On hand 8 + on order 0 is at or below the reorder point: order 65 now.
- 5.Installed on 9 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Proposed purchase requisition
65 EA
Rp 37.0M · order by 01 Oct 2026
Expected arrival ≈ 21 days
ML early warningLast turnaround used 8Single sourceAbnormal consumption
On hand / on order
8 / 0
no open PO
Today Min / Max
33 / 50
static parameters in BoM
Rec. Min (reorder point)
23
safety stock 18
Rec. Max
73
order qty 50
Service level
99.9%
stockout risk now 16%
Unit price
Rp 569,523
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 14 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Erratic · 35 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 9 functional locations
1 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-DS-9130-D12A-HS PIPE-3/4 FROM PP-1280B TO VD-278A | A | 1 | 0 | 0.01 |
| PX_3-FG-4642-A22A-H PIPE-3 FROM PP-563 TO VD-468 | C | 1 | 1 | 0.01 |
| PX_1-1/2-LS-6362-A21A PIPE-1-1/2 FROM VD-1513 TO PP-455D | C | 1 | 0 | 0.01 |
| PX_10-CW-18146-B21A-C PIPE-10 FROM HE-846B TO CL-1319 | C | 1 | 0 | 0.01 |
| PX_2-DS-15303-A11A-T PIPE-2 FROM HE-1532D TO VD-756B | C | 1 | 0 | 0.01 |
| PX_2-IA-23649-A21A-T PIPE-2 FROM PP-210A TO PP-1834B | C | 1 | 0 | 0.01 |
| PX_3/4-BF-5438-D12A-H PIPE-3/4 FROM HE-1590B TO PP-306A | C | 1 | 0 | 0.01 |
| PX_3/4-FG-9721-A11A-T PIPE-3/4 FROM HE-1365D TO KC-778A | C | 1 | 0 | 0.01 |
| PX_3/4-P-6873-B22A-H PIPE-3/4 FROM KC-620A TO VD-623 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 21 ± 13 days (PO history, 15 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Jun 2026 | PR03 Regular replenishment | 42 | Rp 585,568 | 01 Jul 2026 | 8 d |
| 20 Jun 2026 | PR06 Regular replenishment | 37 | Rp 569,523 | 29 Jun 2026 | 9 d |
| 08 Jun 2026 | PR03 Regular replenishment | 73 | Rp 579,764 | 16 Jun 2026 | 8 d |
| 22 Apr 2026 | PR03 Regular replenishment | 60 | Rp 559,301 | 12 May 2026 | 20 d |
| 09 Feb 2026 | PR03 Regular replenishment | 46 | Rp 546,153 | 21 Feb 2026 | 12 d |
| 07 Feb 2026 | PR06 Regular replenishment | 54 | Rp 556,108 | 22 Feb 2026 | 15 d |
| 02 Feb 2026 | PR03 Regular replenishment | 35 | Rp 557,874 | 19 Feb 2026 | 17 d |
| 30 Nov 2025 | PR06 Regular replenishment | 59 | Rp 590,560 | 18 Jan 2026 | 49 d |
| 31 Oct 2025 | PR06 Regular replenishment | 75 | Rp 562,338 | 10 Nov 2025 | 10 d |
| 22 Sept 2025 | PR03 Regular replenishment | 42 | Rp 574,488 | 28 Oct 2025 | 36 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 May 2025 | Medium | PX_3-FG-4642-A22A-H | Install scaffolding at 3-FG-4642-A22A-H |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 5 | 201000007314 | Corrective |
| 17 Sept 2026 | 3 | 201000029503 | Corrective |
| 16 Sept 2026 | 22 | 209000036917 | Other maintenance |
| 10 Sept 2026 | 1 | 201000027353 | Corrective |
| 03 Sept 2026 | 4 | 203000008243 | Turnaround |
| 22 Aug 2026 | 2 | 201000006143 | Corrective |
| 02 Aug 2026 | 3 | 201000008499 | Corrective |
| 07 Jul 2026 | 4 | 209000012005 | Other maintenance |
| 20 Jun 2026 | 6 | 209000027470 | Other maintenance |
| 25 May 2026 | 1 | 201000019630 | Corrective |
| 23 Apr 2026 | 2 | 204000033648 | Preventive |
| 20 Apr 2026 | 5 | 201000020310 | Corrective |
| 19 Apr 2026 | 10 | 209000024091 | Other maintenance |
| 14 Apr 2026 | 1 | 201000025715 | Corrective |
| 07 Apr 2026 | 2 | 201000039783 | Corrective |