Sparely
DU

TEE,10IN,3000#,A234WPB,SW

Material 4100031262 · TEE · Plant 1000

CReduceExcess
Material
4100031262
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 4 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
39 d · P80 55 d
Unit price
Rp 551,536

Recommendation

  • 1.Forecast 61 EA/year: 61 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~39 days; expected demand during lead time 6.5.
  • 3.A 91.6% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 53.
  • 4.Stock 109 exceeds the level to keep (53) by 56.
  • 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 26Single source
On hand / on order
109 / 0
no open PO
Today Min / Max
21 / 58
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 6
Rec. Max
53
order qty 41
Service level
91.6%
stockout risk now 0%
Unit price
Rp 551,536
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 4 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (26 units) excluded from the baseline.

Demand pattern Smooth · 24 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 97.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.

Installed on 4 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_4-LS-22894-A21A-HS
PIPE-4 FROM PP-978 TO PP-1407B
C100.01
PX_6-FG-16025-B23A-C
PIPE-6 FROM PP-1619A TO PP-1202
C100.01
PX_6-LS-25987-A51A-C
PIPE-6 FROM PP-439B TO PP-1141D
C100.01
PX_8-MS-26518-B21A-C
PIPE-8 FROM VD-1391A TO PP-1170
C100.01

Lead time and procurement

Lead time 39 ± 21 days (PO history, 11 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
10 Apr 2026PR03
Regular replenishment
32Rp 566,29119 May 202639 d
25 Mar 2026PR06
Regular replenishment
16Rp 551,53616 Apr 202622 d
09 Mar 2026PR06
Regular replenishment
32Rp 544,81401 Apr 202623 d
04 Mar 2026PR03
Regular replenishment
22Rp 552,77012 Apr 202639 d
18 Feb 2026PR03
Regular replenishment
56Rp 549,04122 Mar 202632 d
08 Feb 2026PR03
Regular replenishment
38Rp 549,87505 Apr 202656 d
29 Dec 2025PR03
Regular replenishment
15Rp 568,90416 Jan 202618 d
04 Dec 2025PR03
Regular replenishment
55Rp 532,77327 Dec 202523 d
29 Nov 2025PR03
Regular replenishment
22Rp 550,27420 Jan 202652 d
03 Nov 2025PR06
Regular replenishment
47Rp 565,65428 Dec 202555 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20266201000028780Corrective
22 Sept 20264209000029477Other maintenance
10 Aug 20264201000027417Corrective
08 Aug 20267201000036904Corrective
24 Jun 20261201000014409Corrective
19 Jun 20266209000014083Other maintenance
26 Apr 20263201000020979Corrective
23 Feb 20262201000036989Corrective
27 Jan 20263201000022923Corrective
26 Jan 20267201000022923Corrective
13 Jan 20262201000004976Corrective
30 Dec 20254201000007000Corrective
27 Dec 20251201000019016Corrective
25 Dec 20256203000006078Turnaround
23 Dec 20253201000039446Corrective