Sparely
DU

TEE,1IN,3000#,A105,SW

Material 4100031298 · TEE · Plant 1000

AReduceExcess
Material
4100031298
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
SURYA PERKASA GLOBAL PT
Lead time
42 d · P80 58 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 41 EA/year: 41 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~42 days; expected demand during lead time 4.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 43.
  • 4.Stock 113 exceeds the level to keep (43) by 70.
  • 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 67% probability of demand in the next 90 days.
ML early warningLast turnaround used 32Single source
On hand / on order
113 / 0
no open PO
Today Min / Max
46 / 144
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 17
Rec. Max
43
order qty 22
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 67% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 23 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (40 units) excluded from the baseline.

Demand pattern Lumpy · 17 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 6 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3-CW-25794-D12A-T
PIPE-3 FROM HE-812B TO PP-912
A100.01
PX_3-BF-24629-B21A
PIPE-3 FROM PP-535A TO CL-899
B100.01
PX_3/4-BF-23136-A41A
PIPE-3/4 FROM PP-1386 TO PP-583B
B300.01
PX_2-P-12628-C11A-HS
PIPE-2 FROM PP-283B TO VD-680
C110.01
PX_8-P-21146-A41A-T
PIPE-8 FROM VD-884 TO PP-1752A
C110.01
PX_3/4-CW-27542-A11A-T
PIPE-3/4 FROM KC-147D TO HE-755D
C100.01

Lead time and procurement

Lead time 42 ± 13 days (PO history, 9 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jun 2026PR03
Regular replenishment
52Rp 1.2M14 Jul 202635 d
21 Dec 2025PR03
Regular replenishment
30Rp 1.3M09 Feb 202650 d
05 Dec 2025PR03
Regular replenishment
43Rp 1.3M30 Jan 202656 d
22 Nov 2025PR03
Regular replenishment
20Rp 1.3M01 Jan 202640 d
28 Oct 2025PR03
Regular replenishment
25Rp 1.3M28 Dec 202561 d
19 Oct 2025PR06
Regular replenishment
17Rp 1.3M25 Nov 202537 d
04 Aug 2025PR06
Regular replenishment
31Rp 1.4M07 Sept 202534 d
06 Jun 2025PR06
Regular replenishment
17Rp 1.3M05 Aug 202560 d
21 May 2025PR03
Regular replenishment
20Rp 1.3M23 Jun 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 May 2025LowPX_8-P-21146-A41A-TLeak at 8-P-21146-A41A-T
16 May 2025MediumPX_2-P-12628-C11A-HSInstall scaffolding at 2-P-12628-C11A-HS

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 20261201000030902Corrective
22 Aug 20261201000037361Corrective
27 Jul 20263201000029643Corrective
16 Jul 20261201000039857Corrective
08 Mar 20264203000020244Turnaround
15 Jan 20262201000019970Corrective
09 Jan 20264203000006950Turnaround
31 Dec 20253204000017029Preventive
25 Dec 202510201000005486Corrective
25 Dec 20254203000006078Turnaround
15 Dec 20258201000017345Corrective
21 Nov 20254203000020131Turnaround
18 Nov 20256203000038363Turnaround
18 Nov 202512203000038363Turnaround
15 Nov 20253201000032456Corrective