Sparely
DU

TEE,4IN,SCH80,A234WPB,BW

Material 4100031331 · TEE · Plant 1000

AMonitorHealthy
Material
4100031331
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
BUANA TEKNIK SENTOSA PT
Lead time
32 d · P80 48 d
Unit price
Rp 1.2M

Recommendation

  • 1.Forecast 28 EA/year: 28 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~32 days; expected demand during lead time 2.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 33.
  • 4.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 98% probability of demand in the next 90 days.
ML early warningLast turnaround used 38Single source
On hand / on order
18 / 0
no open PO
Today Min / Max
10 / 28
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 11
Rec. Max
33
order qty 20
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.2M
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (46 units) excluded from the baseline.

Demand pattern Lumpy · 18 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-HS-27575-B22A-C
PIPE-1-1/2 FROM HE-443A TO KC-284A
A100.01
PX_1-1/2-QO-20842-A51A-T
PIPE-1-1/2 FROM HE-1919A TO VD-1620
C100.01
PX_3-BF-11000-B22A-T
PIPE-3 FROM VD-1391A TO PP-247B
C100.01
PX_6-DS-7159-A41A
PIPE-6 FROM HE-686C TO VD-1170
C100.01

Lead time and procurement

Lead time 32 ± 15 days (PO history, 11 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
03 Sept 2026PR03
Regular replenishment
18Rp 1.2M21 Sept 202618 d
19 Aug 2026PR06
Regular replenishment
21Rp 1.2M11 Sept 202623 d
05 Jul 2026PR03
Regular replenishment
44Rp 1.2M21 Jul 202616 d
22 Jun 2026PR05
Project / turnaround
28Rp 1.2M15 Aug 202654 d
21 Jun 2026PR06
Regular replenishment
49Rp 1.2M17 Jul 202626 d
09 May 2026PR03
Regular replenishment
36Rp 1.2M31 May 202622 d
11 Jan 2026PR03
Regular replenishment
15Rp 1.2M27 Jan 202616 d
09 Jan 2026PR03
Regular replenishment
32Rp 1.1M26 Feb 202648 d
19 Aug 2025PR03
Regular replenishment
26Rp 1.2M26 Sept 202538 d
17 Jun 2025PR06
Regular replenishment
20Rp 1.2M20 Jul 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20263201000028331Corrective
31 Aug 20262203000017844Turnaround
08 Jul 20261201000003402Corrective
28 Jun 20262201000036525Corrective
08 Jun 20261201000003949Corrective
14 May 20261201000025335Corrective
19 Feb 20263201000023270Corrective
14 Feb 20262201000007762Corrective
12 Feb 20264204000033101Preventive
20 Jan 20261201000035707Corrective
20 Jan 20263201000037346Corrective
11 Jan 20266201000009630Corrective
06 Jan 202618203000006950Turnaround
03 Jan 20261201000012619Corrective
01 Jan 20261201000039620Corrective