TEE,3IN,SCH80,A105,SW

Material 4100031340 · TEE · Plant 1000

BReduceExcess
Material
4100031340
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
GUNUNG INDUSTRI PRATAMA PT
Lead time
28 d · P80 35 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 26 EA/year: 26 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~28 days; expected demand during lead time 2.0.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 27.
  • 4.Stock 565 exceeds the level to keep (27) by 538.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 60% probability of demand in the next 90 days.
ML early warningLast turnaround used 6Single sourceOpen PO
On hand / on order
565 / 15
next delivery 07 Oct 2026
Today Min / Max
104 / 254
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
27
order qty 18
Service level
99.5%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 60% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 15 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (26 units) excluded from the baseline.

Demand pattern Intermittent · 19 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 572.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 2 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-IA-27583-B21A-C
PIPE-1-1/2 FROM PP-1106A TO VD-1095A
B100.01
PX_1-1/2-HS-18026-A41A-HS
PIPE-1-1/2 FROM VD-939 TO KC-853D
C300.01

Lead time and procurement

Lead time 28 ± 19 days (PO history, 5 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR03
Regular replenishment
15Rp 1.3M07 Oct 2026
open
29 d
24 May 2026PR03
Regular replenishment
37Rp 1.3M03 Jun 202610 d
23 Feb 2026PR06
Regular replenishment
20Rp 1.3M09 Mar 202614 d
15 Feb 2026PR01
Import / long-lead
32Rp 1.3M16 Apr 202660 d
18 Sept 2025PR03
Regular replenishment
32Rp 1.3M08 Oct 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
16 Sept 20262201000015263Corrective
02 Sept 202620203000008243Turnaround
08 May 20264201000013238Corrective
02 Feb 20267201000009533Corrective
26 Jan 20262201000030872Corrective
16 Jan 20262203000029956Turnaround
01 Jan 20264201000005842Corrective
08 Dec 20253201000019858Corrective
25 Nov 20253201000029876Corrective
23 Nov 20254201000017774Corrective
11 Nov 20255201000024602Corrective
11 Nov 20254203000030064Turnaround
25 Oct 20251201000010563Corrective
16 Oct 20252201000025573Corrective
22 Sept 20252201000005644Corrective