TEE,6IN,SCH80,A234WPB,BW

Material 4100031379 · TEE · Plant 1000

BMaintainHealthy
Material
4100031379
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
CAHAYA PERKASA ABADI PT
Lead time
48 d · P80 60 d
Unit price
Rp 223,111

Recommendation

  • 1.Forecast 29 EA/year: 29 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~48 days; expected demand during lead time 3.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 47.
  • 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 95% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
35 / 15
next delivery 01 Nov 2026
Today Min / Max
9 / 17
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 14
Rec. Max
47
order qty 30
Service level
99.9%
stockout risk now 0%
Unit price
Rp 223,111
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Intermittent · 12 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 571.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-DS-12644-D12A-HS
PIPE-2 FROM VD-1609A TO PP-700
B100.01

Lead time and procurement

Lead time 48 ± 31 days (PO history, 8 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
15 Sept 2026PR03
Regular replenishment
15Rp 212,89601 Nov 2026
open
47 d
09 Jun 2026PR03
Regular replenishment
13Rp 210,78206 Jul 202627 d
24 Nov 2025PR06
Regular replenishment
19Rp 221,15715 Jan 202652 d
18 Jul 2025PR01
Import / long-lead
17Rp 225,06404 Dec 2025139 d
16 Jun 2025PR03
Regular replenishment
16Rp 226,25223 Jul 202537 d
10 Jun 2025PR03
Regular replenishment
11Rp 227,45015 Aug 202566 d
24 May 2025PR06
Regular replenishment
13Rp 225,60803 Jul 202540 d
15 May 2025PR06
Regular replenishment
18Rp 213,97715 Jun 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20264201000022167Corrective
06 Sept 20264201000030840Corrective
23 Aug 20265201000000994Corrective
19 Jun 20262209000014083Other maintenance
17 May 20262201000009393Corrective
04 Apr 20267201000010228Corrective
16 Feb 20261201000011012Corrective
12 Dec 20251201000020697Corrective
08 Dec 20252201000034802Corrective
04 Nov 20253201000038265Corrective
17 Sept 20258201000039916Corrective
15 Aug 20256203000007731Turnaround
28 Jul 20251201000024339Corrective