TEE,6IN,SCH80,A234WPB,BW
Material 4100031379 · TEE · Plant 1000
BMaintainHealthy
- Material
- 4100031379
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA PERKASA ABADI PT
- Lead time
- 48 d · P80 60 d
- Unit price
- Rp 223,111
Recommendation
- 1.Forecast 29 EA/year: 29 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~48 days; expected demand during lead time 3.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 47.
- 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
- 5.ML early warning: 95% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
35 / 15
next delivery 01 Nov 2026
Today Min / Max
9 / 17
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 14
Rec. Max
47
order qty 30
Service level
99.9%
stockout risk now 0%
Unit price
Rp 223,111
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (6 units) excluded from the baseline.
Demand pattern Intermittent · 12 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 571.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-DS-12644-D12A-HS PIPE-2 FROM VD-1609A TO PP-700 | B | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 48 ± 31 days (PO history, 8 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Sept 2026 | PR03 Regular replenishment | 15 | Rp 212,896 | 01 Nov 2026 open | 47 d |
| 09 Jun 2026 | PR03 Regular replenishment | 13 | Rp 210,782 | 06 Jul 2026 | 27 d |
| 24 Nov 2025 | PR06 Regular replenishment | 19 | Rp 221,157 | 15 Jan 2026 | 52 d |
| 18 Jul 2025 | PR01 Import / long-lead | 17 | Rp 225,064 | 04 Dec 2025 | 139 d |
| 16 Jun 2025 | PR03 Regular replenishment | 16 | Rp 226,252 | 23 Jul 2025 | 37 d |
| 10 Jun 2025 | PR03 Regular replenishment | 11 | Rp 227,450 | 15 Aug 2025 | 66 d |
| 24 May 2025 | PR06 Regular replenishment | 13 | Rp 225,608 | 03 Jul 2025 | 40 d |
| 15 May 2025 | PR06 Regular replenishment | 18 | Rp 213,977 | 15 Jun 2025 | 31 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Sept 2026 | 4 | 201000022167 | Corrective |
| 06 Sept 2026 | 4 | 201000030840 | Corrective |
| 23 Aug 2026 | 5 | 201000000994 | Corrective |
| 19 Jun 2026 | 2 | 209000014083 | Other maintenance |
| 17 May 2026 | 2 | 201000009393 | Corrective |
| 04 Apr 2026 | 7 | 201000010228 | Corrective |
| 16 Feb 2026 | 1 | 201000011012 | Corrective |
| 12 Dec 2025 | 1 | 201000020697 | Corrective |
| 08 Dec 2025 | 2 | 201000034802 | Corrective |
| 04 Nov 2025 | 3 | 201000038265 | Corrective |
| 17 Sept 2025 | 8 | 201000039916 | Corrective |
| 15 Aug 2025 | 6 | 203000007731 | Turnaround |
| 28 Jul 2025 | 1 | 201000024339 | Corrective |