TEE,1/4IN,3000#,A105,BW
Material 4100031477 · TEE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100031477
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 29 d · P80 34 d
- Unit price
- Rp 90,494
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 1 is at or below the reorder point: order 2 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 180,988 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Single sourceOpen PO
On hand / on order
1 / 1
next delivery 14 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 90,494
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 111 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 93.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 2 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_6-HS-12392-A21A-H PIPE-6 FROM HE-812B TO HE-1555A | A | 1 | 0 | 0.01 |
| PX_4-FG-13596-A22A-HS PIPE-4 FROM HE-1982 TO CL-634 | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 16 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Sept 2026 | PR04 Regular (other) | 1 | Rp 90,494 | 14 Oct 2026 open | 42 d |
| 03 Jul 2026 | PR06 Regular replenishment | 1 | Rp 93,257 | 20 Jul 2026 | 17 d |
| 01 Oct 2025 | PR03 Regular replenishment | 2 | Rp 88,127 | 23 Oct 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Jun 2026 | 2 | 201000006766 | Corrective |