TEE,1/4IN,3000#,A105,BW

Material 4100031477 · TEE · Plant 1000

AReorderNormalBelow reorder point
Material
4100031477
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
29 d · P80 34 d
Unit price
Rp 90,494

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 1 is at or below the reorder point: order 2 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 180,988 · order by 01 Oct 2026
Expected arrival ≈ 29 days
Single sourceOpen PO
On hand / on order
1 / 1
next delivery 14 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 90,494
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 111 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 93.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_6-HS-12392-A21A-H
PIPE-6 FROM HE-812B TO HE-1555A
A100.01
PX_4-FG-13596-A22A-HS
PIPE-4 FROM HE-1982 TO CL-634
C200.01

Lead time and procurement

Lead time 29 ± 16 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
02 Sept 2026PR04
Regular (other)
1Rp 90,49414 Oct 2026
open
42 d
03 Jul 2026PR06
Regular replenishment
1Rp 93,25720 Jul 202617 d
01 Oct 2025PR03
Regular replenishment
2Rp 88,12723 Oct 202522 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
12 Jun 20262201000006766Corrective