TEE,8IN,SCH40,A105,BW
Material 4100031596 · TEE · Plant 1000
CReduceSlow-moving
- Material
- 4100031596
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 528,853 (est.)
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.1%
stockout risk now 0%
Unit price
Rp 528,853
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 252 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.
Installed on 4 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-DS-23086-A22A-C PIPE-1-1/2 FROM PP-301C TO VD-1110B | C | 1 | 0 | 0.01 |
| PX_1-HS-18000-D12A-HS PIPE-1 FROM PP-1107B TO HE-1003D | C | 1 | 0 | 0.01 |
| PX_3/4-MS-6838-C11A-H PIPE-3/4 FROM PP-1024 TO PP-1168A | C | 1 | 0 | 0.01 |
| PX_3/4-QO-14676-B23A-T PIPE-3/4 FROM PP-785A TO PP-681B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 31 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Jan 2026 | 2 | 201000008172 | Corrective |