Sparely
DU

TEE,3/4IN,3000#,A234WPB,SW

Material 4100031620 · TEE · Plant 1000

AReduceSlow-moving
Material
4100031620
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
29 d · P80 51 d
Unit price
Rp 356,602

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 356,602
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 437 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 27.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_8-CW-14050-A51A-T
PIPE-8 FROM PP-682A TO HE-1479B
A100.01
PX_10-MS-29458-A11A-H
PIPE-10 FROM PP-1945D TO PP-1192
C100.01

Lead time and procurement

Lead time 29 ± 18 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
14 Apr 2026PR05
Project / turnaround
1Rp 356,60205 May 202621 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Jul 20251201000007360Corrective