TEE,3/4IN,SCH80,A234WPB,BW
Material 4100031630 · TEE · Plant 1000
CReorderHighStockout
- Material
- 4100031630
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- BUANA TEKNIK SENTOSA PT
- Lead time
- 26 d · P80 51 d
- Unit price
- Rp 153,434
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.1.
- 3.A 96.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
Proposed purchase requisition
3 EA
Rp 460,302 · order by 01 Oct 2026
Expected arrival ≈ 26 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
96.6%
stockout risk now 3%
Unit price
Rp 153,434
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-LS-6362-A21A PIPE-1-1/2 FROM VD-1513 TO PP-455D | C | 1 | 0 | 0.01 |
| PX_16-HS-5180-D12A-H PIPE->16 FROM HE-320A TO HE-1334 | C | 1 | 0 | 0.01 |
| PX_4-FG-13596-A22A-HS PIPE-4 FROM HE-1982 TO CL-634 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 26 ± 18 days (PO history + category, 1 PO lines) · on-time 29%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR06 Regular replenishment | 1 | Rp 153,434 | 11 Jul 2026 | 12 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Jan 2026 | 3 | 201000005002 | Corrective |
| 13 Jul 2025 | 2 | 209000033701 | Other maintenance |