TEE,1/2IN,SCH40,A105,SW

Material 4100031731 · TEE · Plant 1000

CMonitorHealthy
Material
4100031731
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
29 d · P80 38 d
Unit price
Rp 654,792

Recommendation

  • 1.Forecast 16 EA/year: 16 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 1.3.
  • 3.A 85.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 16.
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
16
order qty 16
Service level
85.2%
stockout risk now 15%
Unit price
Rp 654,792
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 14 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~12 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-IA-27265-A51A-C
PIPE-1-1/2 FROM HE-819 TO CL-672
C100.01
PX_6-HS-18874-A22A-H
PIPE-6 FROM PP-1729A TO HE-902
C100.01

Lead time and procurement

Lead time 29 ± 20 days (PO history, 4 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
09 Apr 2026PR03
Regular replenishment
7Rp 647,40601 May 202622 d
12 Dec 2025PR03
Regular replenishment
10Rp 668,66223 Dec 202511 d
10 Aug 2025PR01
Import / long-lead
6Rp 643,64310 Oct 202561 d
12 May 2025PR06
Regular replenishment
11Rp 662,17831 May 202519 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
17 Sept 20261201000017824Corrective
17 Sept 20268201000017824Corrective
23 Apr 20269204000033648Preventive
22 Apr 20262204000033648Preventive
22 Apr 20264204000033648Preventive