TEE,1/2IN,3000#,A105,BW
Material 4100031861 · TEE · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100031861
- Category
- TEE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 43 d · P80 70 d
- Unit price
- Rp 255,834
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~43 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 767,502 · order by 01 Oct 2026
Expected arrival ≈ 43 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.8%
stockout risk now 6%
Unit price
Rp 255,834
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 286 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 35.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.
Installed on 2 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_16-DS-24185-C11A-T PIPE->16 FROM VD-433 TO VD-1771 | B | 1 | 1 | 0.01 |
| PX_3/4-FG-6875-B21A-T PIPE-3/4 FROM PP-1337 TO VD-511A | B | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 43 ± 22 days (PO history, 3 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Jan 2026 | PR03 Regular replenishment | 2 | Rp 252,612 | 26 Feb 2026 | 34 d |
| 17 Dec 2025 | PR03 Regular replenishment | 1 | Rp 255,834 | 11 Mar 2026 | 84 d |
| 05 Jun 2025 | PR03 Regular replenishment | 1 | Rp 259,515 | 23 Jul 2025 | 48 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 May 2025 | Medium | PX_16-DS-24185-C11A-T | Reinject compound online clamp sealing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Dec 2025 | 3 | 201000036958 | Corrective |
| 18 Dec 2025 | 1 | 201000036958 | Corrective |