Sparely
DU

TEE,1/2IN,3000#,A105,BW

Material 4100031861 · TEE · Plant 1000

BReorderNormalSlow-moving
Material
4100031861
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 2 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
43 d · P80 70 d
Unit price
Rp 255,834

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 767,502 · order by 01 Oct 2026
Expected arrival ≈ 43 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.8%
stockout risk now 6%
Unit price
Rp 255,834
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 286 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 35.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 2 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_16-DS-24185-C11A-T
PIPE->16 FROM VD-433 TO VD-1771
B110.01
PX_3/4-FG-6875-B21A-T
PIPE-3/4 FROM PP-1337 TO VD-511A
B200.01

Lead time and procurement

Lead time 43 ± 22 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
23 Jan 2026PR03
Regular replenishment
2Rp 252,61226 Feb 202634 d
17 Dec 2025PR03
Regular replenishment
1Rp 255,83411 Mar 202684 d
05 Jun 2025PR03
Regular replenishment
1Rp 259,51523 Jul 202548 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 May 2025MediumPX_16-DS-24185-C11A-TReinject compound online clamp sealing

Recent goods issues

Posting dateQtyOrderOrder type
19 Dec 20253201000036958Corrective
18 Dec 20251201000036958Corrective