Material 4100032021 · TEE · Plant 1000

BReduceExcess
Material
4100032021
Category
TEE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
40 d · P80 65 d
Unit price
Rp 236,810

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~40 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 14 exceeds the level to keep (2) by 12.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 42% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
14 / 5
next delivery 02 Oct 2026
Today Min / Max
6 / 17
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 236,810
PO history
ML early warning: 42% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 159 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (24 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 28.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~12 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-IA-29736-B21A
PIPE-2 FROM HE-1205B TO KC-265
B100.01
PX_3/4-BF-17129-A22A
PIPE-3/4 FROM PP-705 TO HE-589D
C120.44
PX_1-1/2-LS-11150-A41A-T
PIPE-1-1/2 FROM HE-1348 TO HE-1479B
C100.01
PX_3/4-P-6518-A41A-HS
PIPE-3/4 FROM KC-669 TO HE-1808D
C100.01

Lead time and procurement

Lead time 40 ± 22 days (PO history, 5 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
06 Sept 2026PR06
Regular replenishment
5Rp 235,95002 Oct 2026
open
26 d
11 Jul 2026PR04
Regular (other)
4Rp 236,81027 Sept 202678 d
28 Mar 2026PR06
Regular replenishment
5Rp 246,01807 May 202640 d
29 Oct 2025PR06
Regular replenishment
7Rp 226,70918 Nov 202520 d
17 Jul 2025PR03
Regular replenishment
7Rp 243,41817 Sept 202562 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Apr 2026MediumPX_3/4-BF-17129-A22AClean dummy leg 3/4-BF-17129-A22A
27 May 2025MediumPX_3/4-BF-17129-A22ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
25 Apr 20261201000009261Corrective
10 Feb 20268203000032991Turnaround
10 Feb 20264203000032991Turnaround
09 Feb 20266203000032991Turnaround
05 Feb 20266203000032991Turnaround