FLANGE,WN,10IN,600#,SS316,RF

Material 4100032857 · FLANGE · Plant 1000

ALong-leadReduceExcess
Material
4100032857
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (21 of 57 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA PERSADA PT
Lead time
84 d · P80 120 d
Unit price
Rp 927,596

Recommendation

  • 1.Forecast 437 EA/year: 437 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~84 days; expected demand during lead time 101.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 329, order up to 414.
  • 4.Stock 465 exceeds the level to keep (414) by 51.
  • 5.Long lead time: 80% of deliveries took up to 120 days and the fastest seen in its category 19 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 57 FuncLoc(s), 21 of them criticality A/B.
  • 7.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 130Single sourceAbnormal consumptionOpen PO
On hand / on order
465 / 2,107
next delivery 15 Oct 2026
Today Min / Max
70 / 189
static parameters in BoM
Rec. Min (reorder point)
329
safety stock 228
Rec. Max
414
order qty 85
Service level
99.9%
stockout risk now 0%
Unit price
Rp 927,596
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 40 issue days in the last 180 days, last issue 1 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 18 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (242 units) excluded from the baseline.

Demand pattern Erratic · 152 issue days · 9 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 38.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 57 functional locations

21 with criticality A/B · 72 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-126D
DILUTION STEAM PREHEATER
A351.08
PX_HE-1393C
QUENCH WATER PREHEATER
A131.08
PX_HE-534C
SEAL OIL TLE
A130.65
PX_HE-1455C
COOLING WATER COOLER
A110.22
PX_HE-1256A
REFLUX PREHEATER
A100.22
PX_HE-439C
LUBE OIL REBOILER
A300.22
PX_HE-895B
DEMIN WATER EXCHANGER
A100.22
PX_HE-974
SLOP OIL CONDENSER
A100.22
PX_ROF-1273A
MP STEAM TO VD-1479
A100.00
PY_HE-724
ETHYLENE REBOILER
A100.22
PX_HE-1874C
METHANOL COOLER
B131.08
PX_HE-1164D
QUENCH WATER CONDENSER
B121.08

Lead time and procurement

Lead time 84 ± 57 days (PO history, 57 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR05
Project / turnaround
322Rp 939,07719 Feb 2027
open
165 d
05 Sept 2026PR05
Project / turnaround
177Rp 926,63127 Jan 2027
open
144 d
22 Aug 2026PR03
Regular replenishment
224Rp 911,12609 Nov 2026
open
79 d
19 Aug 2026PR04
Regular (other)
197Rp 899,97025 Nov 2026
open
98 d
17 Aug 2026PR03
Regular replenishment
151Rp 930,64619 May 2027
open
275 d
11 Aug 2026PR06
Regular replenishment
336Rp 889,92605 Sept 202625 d
04 Aug 2026PR06
Regular replenishment
253Rp 924,32822 Sept 202649 d
01 Aug 2026PR03
Regular replenishment
181Rp 946,26209 Sept 202639 d
30 Jul 2026PR03
Regular replenishment
459Rp 904,44015 Oct 2026
open
77 d
27 Jul 2026PR03
Regular replenishment
392Rp 892,31903 Nov 2026
open
99 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Aug 2026LowPX_HE-126DReplace lamp as per PM finding
26 Aug 2026MediumPX_HE-1393CHE-1393C tube leak
24 Aug 2026MediumPX_3/4-FG-20458-A41A-HSReplace lamp as per PM finding
23 Aug 2026HighPX_HE-1393CReplace lamp as per PM finding
22 Aug 2026MediumPX_1-BF-24318-A22A-HSClean dummy leg 1-BF-24318-A22A-HS
08 Jul 2026MediumPX_HE-1874CReplace lamp as per PM finding
06 Jul 2026MediumPX_HE-126DInstall scaffolding at HE-126D
04 Jul 2026MediumPX_HE-1164DLeak from packing
13 May 2026MediumPX_HE-1727HE-1727 fouling
03 Mar 2026MediumPX_HE-1874CLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20263201000031410Corrective
27 Sept 20263201000014873Corrective
22 Sept 20261201000013988Corrective
21 Sept 20261201000010227Corrective
18 Sept 20262209000036917Other maintenance
10 Sept 20266201000035065Corrective
10 Sept 20261204000002121Preventive
06 Sept 20263201000022798Corrective
04 Sept 20261201000031484Corrective
23 Aug 20262201000000994Corrective
22 Aug 20262201000010149Corrective
14 Aug 202610209000023087Other maintenance
12 Aug 20261201000033551Corrective
10 Aug 20262201000035120Corrective
31 Jul 20268201000033262Corrective