FLANGE,WN,8IN,300#,A105,RF
Material 4100032880 · FLANGE · Plant 1000
AReduceExcess
- Material
- 4100032880
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (18 of 34 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 32 d · P80 43 d
- Unit price
- Rp 140,009
Recommendation
- 1.Forecast 204 EA/year: 204 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~32 days; expected demand during lead time 18.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 68, order up to 216.
- 4.Stock 433 exceeds the level to keep (216) by 217.
- 5.Installed on 34 FuncLoc(s), 18 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 76Single sourceAbnormal consumptionOpen PO
On hand / on order
433 / 223
next delivery 04 Nov 2026
Today Min / Max
105 / 195
static parameters in BoM
Rec. Min (reorder point)
68
safety stock 51
Rec. Max
216
order qty 148
Service level
99.9%
stockout risk now 0%
Unit price
Rp 140,009
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 26 issue days in the last 180 days, last issue 1 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 10 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (88 units) excluded from the baseline.
Demand pattern Smooth · 77 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 20.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 34 functional locations
18 with criticality A/B · 38 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-314B ETHYLENE CONDENSER | A | 1 | 3 | 1.08 |
| PX_HE-693B ETHYLENE EXCHANGER | A | 1 | 3 | 1.08 |
| PX_HE-1034A SLOP OIL REBOILER | A | 3 | 2 | 0.65 |
| PX_HE-1537D SLOP OIL EXCHANGER | A | 1 | 2 | 0.65 |
| PX_HE-1025 BFW PREHEATER | A | 1 | 1 | 0.22 |
| PX_3-CW-25794-D12A-T PIPE-3 FROM HE-812B TO PP-912 | A | 1 | 0 | 0.01 |
| PX_HE-1693C CAUSTIC TLE | A | 1 | 0 | 0.22 |
| PX_HE-397 SEAL OIL COOLER | A | 1 | 0 | 0.22 |
| PX_HE-443A HYDROGEN COOLER | A | 1 | 0 | 0.22 |
| PX_HE-1855B FUEL OIL COOLER | B | 1 | 2 | 0.65 |
| PX_HE-554 CHARGE GAS TLE | B | 1 | 2 | 0.65 |
| PX_HE-1003D C4 PRODUCT COOLER | B | 1 | 1 | 0.22 |
Lead time and procurement
Lead time 32 ± 21 days (PO history, 28 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR03 Regular replenishment | 79 | Rp 134,730 | 26 Sept 2026 | 14 d |
| 04 Sept 2026 | PR03 Regular replenishment | 75 | Rp 135,922 | 29 Nov 2026 open | 86 d |
| 10 Aug 2026 | PR01 Import / long-lead | 148 | Rp 140,368 | 04 Nov 2026 open | 86 d |
| 24 Jul 2026 | PR06 Regular replenishment | 84 | Rp 135,924 | 04 Sept 2026 | 42 d |
| 19 Jul 2026 | PR05 Project / turnaround | 177 | Rp 133,721 | 01 Sept 2026 | 44 d |
| 07 Jul 2026 | PR03 Regular replenishment | 108 | Rp 143,469 | 19 Jul 2026 | 12 d |
| 06 Jul 2026 | PR03 Regular replenishment | 129 | Rp 140,459 | 29 Jul 2026 | 23 d |
| 01 Jul 2026 | PR03 Regular replenishment | 52 | Rp 136,298 | 11 Jul 2026 | 10 d |
| 25 Jun 2026 | PR01 Import / long-lead | 52 | Rp 139,851 | 21 Aug 2026 | 57 d |
| 06 Jun 2026 | PR03 Regular replenishment | 76 | Rp 144,452 | 06 Jul 2026 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_HE-693B | Retubing HE-693B |
| 13 Sept 2026 | Medium | PX_HE-554 | Cleaning HE-554 |
| 21 Aug 2026 | Low | PX_HE-1537D | Retubing HE-1537D |
| 10 Jun 2026 | Low | PX_HE-314B | HE-314B tube leak |
| 23 Dec 2025 | Low | PX_HE-314B | Leak from packing |
| 02 Oct 2025 | Medium | PX_HE-693B | HE-693B fouling |
| 04 Sept 2025 | Medium | PX_HE-1034A | Leak from packing |
| 21 Aug 2025 | Low | PX_HE-1855B | [MSI-B-25-PTB-188] Permanent repair |
| 03 Jun 2025 | Medium | PX_2-BF-27803-A21A | Leak from packing |
| 30 May 2025 | Low | PX_HE-1537D | HE-1537D fouling |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1 | 201000024833 | Corrective |
| 26 Sept 2026 | 1 | 201000005210 | Corrective |
| 26 Sept 2026 | 2 | 201000018567 | Corrective |
| 03 Sept 2026 | 1 | 204000034612 | Preventive |
| 25 Aug 2026 | 1 | 201000010184 | Corrective |
| 16 Aug 2026 | 2 | 201000031531 | Corrective |
| 16 Aug 2026 | 1 | 201000032840 | Corrective |
| 12 Aug 2026 | 13 | 201000019676 | Corrective |
| 10 Aug 2026 | 1 | 201000006061 | Corrective |
| 07 Aug 2026 | 3 | 201000003428 | Corrective |
| 14 Jul 2026 | 2 | 201000024244 | Corrective |
| 07 Jul 2026 | 1 | 204000002628 | Preventive |
| 11 Jun 2026 | 14 | 209000014321 | Other maintenance |
| 08 Jun 2026 | 4 | 201000034570 | Corrective |
| 06 Jun 2026 | 3 | 201000025799 | Corrective |