FLANGE,SO,1/4IN,300#,SS316,RF

Material 4100032889 · FLANGE · Plant 1000

AReduceExcess
Material
4100032889
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 15 FuncLocs A/B)
Supplier
KARYA MANDIRI PRATAMA PT
Lead time
49 d · P80 63 d
Unit price
Rp 291,395

Recommendation

  • 1.Forecast 107 EA/year: 107 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~49 days; expected demand during lead time 14.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 129.
  • 4.Stock 5,584 exceeds the level to keep (129) by 5,455.
  • 5.Installed on 15 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 52Single sourceAbnormal consumptionOpen PO
On hand / on order
5,584 / 51
next delivery 09 Oct 2026
Today Min / Max
78 / 202
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 40
Rec. Max
129
order qty 75
Service level
99.9%
stockout risk now 0%
Unit price
Rp 291,395
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 11 issue days in the last 180 days, last issue 12 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (76 units) excluded from the baseline.

Demand pattern Smooth · 42 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 15 functional locations

6 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-966
C4 PRODUCT PREHEATER
A100.22
PY_HE-532D
ETHYLENE COOLER
A100.22
PX_HE-1164D
QUENCH WATER CONDENSER
B121.08
PX_HE-108B
SLOP OIL TLE
B110.22
PX_3/4-QO-8011-B23A-H
PIPE-3/4 FROM VD-507A TO KC-460B
B200.01
PX_HE-725C
FLUSHING OIL COOLER
B100.22
PX_HE-239D
RECYCLE ETHANE TLE
C151.08
PX_8-P-23318-B23A
PIPE-8 FROM HE-105D TO PP-1638B
C110.01
PX_1-1/2-FG-2877-A22A-T
PIPE-1-1/2 FROM HE-1158A TO PP-129D
C100.01
PX_3/4-HS-17520-C11A-HS
PIPE-3/4 FROM PP-1121 TO VD-468
C100.01
PX_3/4-LS-6619-A22A-C
PIPE-3/4 FROM PP-191C TO KC-210D
C100.01
PX_3/4-MS-28217-A11A-H
PIPE-3/4 FROM HE-1593C TO HE-432D
C100.01

Lead time and procurement

Lead time 49 ± 29 days (PO history, 20 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
04 Sept 2026PR03
Regular replenishment
51Rp 293,82909 Oct 2026
open
35 d
21 Aug 2026PR03
Regular replenishment
77Rp 285,78128 Sept 202638 d
21 Jul 2026PR06
Regular replenishment
64Rp 298,73616 Aug 202626 d
10 Jul 2026PR03
Regular replenishment
51Rp 288,50120 Sept 202672 d
12 Apr 2026PR06
Regular replenishment
35Rp 297,98903 Jun 202652 d
12 Apr 2026PR03
Regular replenishment
61Rp 284,05211 Jun 202660 d
03 Apr 2026PR03
Regular replenishment
89Rp 294,32301 May 202628 d
23 Mar 2026PR06
Regular replenishment
81Rp 290,61912 Apr 202620 d
18 Mar 2026PR03
Regular replenishment
109Rp 292,17018 May 202661 d
13 Mar 2026PR03
Regular replenishment
106Rp 294,97707 May 202655 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026MediumPX_HE-239DReplace lamp as per PM finding
04 Jul 2026MediumPX_HE-1164DLeak from packing
09 Feb 2026LowPX_HE-239DInstall scaffolding at HE-239D
04 Nov 2025MediumPX_HE-239DReplace lamp as per PM finding
25 Oct 2025EmergencyPX_HE-239DInstall scaffolding at HE-239D
18 Jun 2025MediumPX_HE-1164DLeak from packing
29 May 2025MediumPX_8-P-23318-B23ALeak at 8-P-23318-B23A
27 May 2025MediumPX_HE-239DHE-239D tube leak
08 May 2025MediumPX_HE-108BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
19 Sept 20262209000036917Other maintenance
18 Sept 202611201000017824Corrective
06 Sept 20263201000030840Corrective
06 Sept 202618203000008243Turnaround
01 Sept 20261201000009076Corrective
25 Jul 20263201000025485Corrective
16 Jul 20262201000010505Corrective
06 Jul 20262209000017779Other maintenance
30 Jun 20262209000022177Other maintenance
11 Jun 202610209000014321Other maintenance
04 Jun 20262201000031385Corrective
20 Apr 20266209000024091Other maintenance
27 Mar 20263201000027420Corrective
10 Mar 20263201000015564Corrective
09 Mar 20262204000033725Preventive