FLANGE,SO,1/4IN,300#,SS316,RF
Material 4100032889 · FLANGE · Plant 1000
AReduceExcess
- Material
- 4100032889
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 15 FuncLocs A/B)
- Supplier
- KARYA MANDIRI PRATAMA PT
- Lead time
- 49 d · P80 63 d
- Unit price
- Rp 291,395
Recommendation
- 1.Forecast 107 EA/year: 107 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~49 days; expected demand during lead time 14.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 129.
- 4.Stock 5,584 exceeds the level to keep (129) by 5,455.
- 5.Installed on 15 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 52Single sourceAbnormal consumptionOpen PO
On hand / on order
5,584 / 51
next delivery 09 Oct 2026
Today Min / Max
78 / 202
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 40
Rec. Max
129
order qty 75
Service level
99.9%
stockout risk now 0%
Unit price
Rp 291,395
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 11 issue days in the last 180 days, last issue 12 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (76 units) excluded from the baseline.
Demand pattern Smooth · 42 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 15 functional locations
6 with criticality A/B · 19 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-966 C4 PRODUCT PREHEATER | A | 1 | 0 | 0.22 |
| PY_HE-532D ETHYLENE COOLER | A | 1 | 0 | 0.22 |
| PX_HE-1164D QUENCH WATER CONDENSER | B | 1 | 2 | 1.08 |
| PX_HE-108B SLOP OIL TLE | B | 1 | 1 | 0.22 |
| PX_3/4-QO-8011-B23A-H PIPE-3/4 FROM VD-507A TO KC-460B | B | 2 | 0 | 0.01 |
| PX_HE-725C FLUSHING OIL COOLER | B | 1 | 0 | 0.22 |
| PX_HE-239D RECYCLE ETHANE TLE | C | 1 | 5 | 1.08 |
| PX_8-P-23318-B23A PIPE-8 FROM HE-105D TO PP-1638B | C | 1 | 1 | 0.01 |
| PX_1-1/2-FG-2877-A22A-T PIPE-1-1/2 FROM HE-1158A TO PP-129D | C | 1 | 0 | 0.01 |
| PX_3/4-HS-17520-C11A-HS PIPE-3/4 FROM PP-1121 TO VD-468 | C | 1 | 0 | 0.01 |
| PX_3/4-LS-6619-A22A-C PIPE-3/4 FROM PP-191C TO KC-210D | C | 1 | 0 | 0.01 |
| PX_3/4-MS-28217-A11A-H PIPE-3/4 FROM HE-1593C TO HE-432D | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 49 ± 29 days (PO history, 20 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Sept 2026 | PR03 Regular replenishment | 51 | Rp 293,829 | 09 Oct 2026 open | 35 d |
| 21 Aug 2026 | PR03 Regular replenishment | 77 | Rp 285,781 | 28 Sept 2026 | 38 d |
| 21 Jul 2026 | PR06 Regular replenishment | 64 | Rp 298,736 | 16 Aug 2026 | 26 d |
| 10 Jul 2026 | PR03 Regular replenishment | 51 | Rp 288,501 | 20 Sept 2026 | 72 d |
| 12 Apr 2026 | PR06 Regular replenishment | 35 | Rp 297,989 | 03 Jun 2026 | 52 d |
| 12 Apr 2026 | PR03 Regular replenishment | 61 | Rp 284,052 | 11 Jun 2026 | 60 d |
| 03 Apr 2026 | PR03 Regular replenishment | 89 | Rp 294,323 | 01 May 2026 | 28 d |
| 23 Mar 2026 | PR06 Regular replenishment | 81 | Rp 290,619 | 12 Apr 2026 | 20 d |
| 18 Mar 2026 | PR03 Regular replenishment | 109 | Rp 292,170 | 18 May 2026 | 61 d |
| 13 Mar 2026 | PR03 Regular replenishment | 106 | Rp 294,977 | 07 May 2026 | 55 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Medium | PX_HE-239D | Replace lamp as per PM finding |
| 04 Jul 2026 | Medium | PX_HE-1164D | Leak from packing |
| 09 Feb 2026 | Low | PX_HE-239D | Install scaffolding at HE-239D |
| 04 Nov 2025 | Medium | PX_HE-239D | Replace lamp as per PM finding |
| 25 Oct 2025 | Emergency | PX_HE-239D | Install scaffolding at HE-239D |
| 18 Jun 2025 | Medium | PX_HE-1164D | Leak from packing |
| 29 May 2025 | Medium | PX_8-P-23318-B23A | Leak at 8-P-23318-B23A |
| 27 May 2025 | Medium | PX_HE-239D | HE-239D tube leak |
| 08 May 2025 | Medium | PX_HE-108B | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Sept 2026 | 2 | 209000036917 | Other maintenance |
| 18 Sept 2026 | 11 | 201000017824 | Corrective |
| 06 Sept 2026 | 3 | 201000030840 | Corrective |
| 06 Sept 2026 | 18 | 203000008243 | Turnaround |
| 01 Sept 2026 | 1 | 201000009076 | Corrective |
| 25 Jul 2026 | 3 | 201000025485 | Corrective |
| 16 Jul 2026 | 2 | 201000010505 | Corrective |
| 06 Jul 2026 | 2 | 209000017779 | Other maintenance |
| 30 Jun 2026 | 2 | 209000022177 | Other maintenance |
| 11 Jun 2026 | 10 | 209000014321 | Other maintenance |
| 04 Jun 2026 | 2 | 201000031385 | Corrective |
| 20 Apr 2026 | 6 | 209000024091 | Other maintenance |
| 27 Mar 2026 | 3 | 201000027420 | Corrective |
| 10 Mar 2026 | 3 | 201000015564 | Corrective |
| 09 Mar 2026 | 2 | 204000033725 | Preventive |