FLANGE,WN,6IN,300#,SS316,RF

Material 4100032929 · FLANGE · Plant 1000

BReduceExcess
Material
4100032929
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
B (3 of 7 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
32 d · P80 39 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 44 EA/year: 44 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~32 days; expected demand during lead time 3.9.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 32.
  • 4.Stock 50 exceeds the level to keep (40) by 10; the level includes the 40 used in the last turnaround.
  • 5.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 40Single sourceAbnormal consumptionOpen PO
On hand / on order
50 / 59
next delivery 28 Oct 2026
Today Min / Max
9 / 20
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 13
Rec. Max
32
order qty 16
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 33 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (50 units) excluded from the baseline.

Demand pattern Erratic · 26 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.

Installed on 7 functional locations

3 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1562C
GASOLINE COOLER
B320.65
PX_HE-779D
FEED PREHEATER
B110.22
PX_4-FG-2131-B22A-T
PIPE-4 FROM KC-505D TO HE-1305B
B300.01
PX_8-IA-11969-A22A-C
PIPE-8 FROM HE-668D TO HE-1396C
C110.01
PX_1-1/2-MS-3565-A51A-HS
PIPE-1-1/2 FROM PP-790A TO VD-269
C100.01
PX_3-BF-11000-B22A-T
PIPE-3 FROM VD-1391A TO PP-247B
C100.01
PX_8-QO-11422-B23A-T
PIPE-8 FROM PP-1500B TO HE-394
C100.01

Lead time and procurement

Lead time 32 ± 18 days (PO history, 6 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
59Rp 2.8M28 Oct 2026
open
49 d
01 Jun 2026PR03
Regular replenishment
33Rp 2.8M20 Jun 202619 d
03 May 2026PR03
Regular replenishment
39Rp 2.9M12 May 20269 d
26 Mar 2026PR03
Regular replenishment
19Rp 3.0M16 Apr 202621 d
07 Nov 2025PR06
Regular replenishment
61Rp 2.9M29 Nov 202522 d
25 Sept 2025PR03
Regular replenishment
47Rp 2.8M03 Nov 202539 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Jul 2026LowPX_HE-1562CCleaning HE-1562C
12 Jul 2025MediumPX_HE-1562CInstall scaffolding at HE-1562C
29 May 2025MediumPX_HE-779DPSM25/Cleaning HE-779D
07 May 2025HighPX_8-IA-11969-A22A-CReinject compound online clamp sealing

Recent goods issues

Posting dateQtyOrderOrder type
03 Sept 20262203000008243Turnaround
29 Aug 20262201000023879Corrective
08 Jul 20263204000027608Preventive
08 May 20264201000013238Corrective
06 Apr 20261201000021112Corrective
12 Mar 20262201000025906Corrective
16 Feb 20264201000028927Corrective
24 Jan 20263201000006146Corrective
21 Jan 20265201000014244Corrective
19 Jan 20266201000037627Corrective
08 Jan 20262201000009418Corrective
08 Jan 20262201000029776Corrective
06 Jan 20263201000001254Corrective
03 Jan 20263201000001557Corrective
02 Jan 20262201000001557Corrective