FLANGE,BLIND,1-1/2IN,600#,SS316,RF

Material 4100032963 · FLANGE · Plant 1000

AMonitorHealthy
Material
4100032963
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
57 d · P80 79 d
Unit price
Rp 1.5M

Recommendation

  • 1.Forecast 63 EA/year: 63 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~57 days; expected demand during lead time 9.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 33, order up to 58.
  • 4.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
  • 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourceAbnormal consumption
On hand / on order
53 / 0
no open PO
Today Min / Max
10 / 28
static parameters in BoM
Rec. Min (reorder point)
33
safety stock 24
Rec. Max
58
order qty 25
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.5M
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 33 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4 units) excluded from the baseline.

Demand pattern Erratic · 28 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 10 functional locations

5 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-HS-27575-B22A-C
PIPE-1-1/2 FROM HE-443A TO KC-284A
A100.01
PX_HE-874B
HYDROGEN CONDENSER
A100.22
PX_2-DS-23750-A41A-T
PIPE-2 FROM PP-1384B TO HE-1975
B100.01
PX_3-BF-24629-B21A
PIPE-3 FROM PP-535A TO CL-899
B100.01
PX_ROF-1370A
MP STEAM TO VD-1976
B100.00
PX_1-IA-7369-B23A
PIPE-1 FROM PP-315A TO HE-1647D
C310.44
PX_1-LS-22184-A22A-C
PIPE-1 FROM PP-160B TO HE-118B
C100.01
PX_3/4-LS-15747-B23A-H
PIPE-3/4 FROM VD-1282 TO KC-942D
C100.01
PX_4-DS-17552-B23A-T
PIPE-4 FROM PP-1721A TO PP-1694A
C100.01
PX_8-QO-9275-A22A-H
PIPE-8 FROM HE-1025 TO HE-1968B
C100.01

Lead time and procurement

Lead time 57 ± 23 days (PO history, 15 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
20 Jun 2026PR03
Regular replenishment
21Rp 1.5M08 Aug 202649 d
31 May 2026PR03
Regular replenishment
52Rp 1.6M07 Jul 202637 d
21 Apr 2026PR03
Regular replenishment
51Rp 1.6M21 Jul 202691 d
11 Apr 2026PR05
Project / turnaround
39Rp 1.5M06 Jul 202686 d
21 Mar 2026PR03
Regular replenishment
40Rp 1.5M18 May 202658 d
19 Feb 2026PR03
Regular replenishment
32Rp 1.5M30 Apr 202670 d
10 Jan 2026PR03
Regular replenishment
38Rp 1.5M16 Mar 202665 d
06 Jan 2026PR06
Regular replenishment
27Rp 1.5M03 Mar 202656 d
29 Dec 2025PR03
Regular replenishment
23Rp 1.5M12 Jan 202614 d
04 Oct 2025PR03
Regular replenishment
21Rp 1.5M21 Dec 202578 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Jul 2025MediumPX_1-IA-7369-B23AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
29 Aug 202610201000018854Corrective
28 Aug 20261201000033538Corrective
24 Aug 20262201000024850Corrective
16 Jun 20265201000020060Corrective
08 Jun 20266209000008419Other maintenance
29 May 20262201000004169Corrective
24 May 20261205000013712Other maintenance
17 Apr 20266209000024091Other maintenance
22 Mar 20265201000008585Corrective
07 Feb 20261201000011728Corrective
16 Jan 20261201000030451Corrective
12 Jan 20261201000009620Corrective
06 Jan 20265204000017020Preventive
02 Jan 20261201000037561Corrective
22 Dec 20252201000009922Corrective