FLANGE,SO,1-1/2IN,300#,SS316,RF

Material 4100033024 · FLANGE · Plant 1000

AReorderNormalBelow reorder point
Material
4100033024
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 9 FuncLocs A/B)
Supplier
BERKAH INDUSTRI NUSANTARA PT
Lead time
34 d · P80 39 d
Unit price
Rp 285,974

Recommendation

  • 1.Forecast 55 EA/year: 55 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~34 days; expected demand during lead time 5.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 23, order up to 77.
  • 4.On hand 11 + on order 0 is at or below the reorder point: order 66 now.
  • 5.Installed on 9 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
66 EA
Rp 18.9M · order by 01 Oct 2026
Expected arrival ≈ 34 days
ML early warningLast turnaround used 6Single sourceAbnormal consumption
On hand / on order
11 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
23
safety stock 18
Rec. Max
77
order qty 54
Service level
99.9%
stockout risk now 16%
Unit price
Rp 285,974
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 9 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (26 units) excluded from the baseline.

Demand pattern Lumpy · 24 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 9 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_HE-1907A
METHANE TLE
A131.08
PX_HE-1097A
ETHYLENE CONDENSER
A100.22
PX_HE-554
CHARGE GAS TLE
B120.65
PX_HE-1650B
INHIBITOR REBOILER
B100.22
PX_8-P-21146-A41A-T
PIPE-8 FROM VD-884 TO PP-1752A
C110.01
PX_1-P-12689-B22A
PIPE-1 FROM PP-315A TO VD-664B
C100.01
PX_6-QO-3962-A22A-HS
PIPE-6 FROM HE-1437C TO VD-1820
C100.01
PX_HE-686C
CONDENSATE TLE
C100.22
PX_ROF-545
RESTRICTION ORIFICE
C100.00

Lead time and procurement

Lead time 34 ± 14 days (PO history, 11 PO lines) · on-time 46%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR03
Regular replenishment
32Rp 292,63625 Sept 202638 d
02 Jul 2026PR03
Regular replenishment
18Rp 285,00027 Jul 202625 d
04 Jun 2026PR03
Regular replenishment
15Rp 301,34427 Jun 202623 d
27 May 2026PR03
Regular replenishment
34Rp 304,72910 Jun 202614 d
27 May 2026PR03
Regular replenishment
48Rp 292,86001 Jul 202635 d
30 Apr 2026PR03
Regular replenishment
32Rp 285,97417 Jun 202648 d
02 Mar 2026PR03
Regular replenishment
54Rp 283,72129 Mar 202627 d
22 Feb 2026PR04
Regular (other)
36Rp 283,52811 Apr 202648 d
30 Jan 2026PR03
Regular replenishment
50Rp 279,81920 Feb 202621 d
25 Nov 2025PR06
Regular replenishment
26Rp 288,40323 Dec 202528 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026MediumPX_HE-554Cleaning HE-554
11 Nov 2025LowPY_HE-1907ALeak from packing
03 Sept 2025MediumPY_HE-1907ACleaning HE-1907A
22 May 2025LowPX_8-P-21146-A41A-TLeak at 8-P-21146-A41A-T
18 May 2025MediumPY_HE-1907AReplace lamp as per PM finding
04 May 2025MediumPX_HE-554Install scaffolding at HE-554

Recent goods issues

Posting dateQtyOrderOrder type
22 Sept 20262204000002989Preventive
29 Aug 20262201000033538Corrective
12 Aug 202610201000031702Corrective
23 Jun 20262201000026692Corrective
17 Apr 20261201000034116Corrective
31 Mar 20264204000008605Preventive
16 Mar 20261204000038539Preventive
13 Mar 20268201000017511Corrective
19 Feb 20262201000005562Corrective
15 Feb 20264201000025502Corrective
30 Jan 20263201000022888Corrective
28 Jan 20261201000006492Corrective
25 Dec 20251201000030056Corrective
25 Dec 20252201000034498Corrective
21 Dec 20257201000028335Corrective