FLANGE,WN,8IN,150#,A105,RF

Material 4100033030 · FLANGE · Plant 1000

BMonitorHealthy
Material
4100033030
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 3 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
27 d · P80 22 d
Unit price
Rp 210,270

Recommendation

  • 1.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~27 days; expected demand during lead time 1.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 25.
  • 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 5.ML early warning: 74% probability of demand in the next 90 days.
ML early warningLast turnaround used 12Single sourceAbnormal consumption
On hand / on order
14 / 0
no open PO
Today Min / Max
7 / 15
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
25
order qty 16
Service level
99.9%
stockout risk now 0%
Unit price
Rp 210,270
PO history
ML early warning: 74% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 88 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Intermittent · 12 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 575.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1959
REFLUX PREHEATER
B151.50
PX_HE-1562C
GASOLINE COOLER
B120.65
PX_3/4-LS-2770-D12A-H
PIPE-3/4 FROM PP-207 TO VD-185
C110.01

Lead time and procurement

Lead time 27 ± 11 days (PO history, 6 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
19Rp 221,24124 Sept 202615 d
14 Aug 2026PR06
Regular replenishment
13Rp 207,46131 Aug 202617 d
27 May 2026PR03
Regular replenishment
12Rp 206,38513 Jun 202617 d
11 Apr 2026PR03
Regular replenishment
18Rp 210,71303 May 202622 d
16 Mar 2026PR03
Regular replenishment
10Rp 221,16801 Apr 202616 d
04 Aug 2025PR03
Regular replenishment
16Rp 209,82630 Aug 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jul 2026MediumPX_HE-1959Install scaffolding at HE-1959
03 Jul 2026LowPX_HE-1562CCleaning HE-1562C
12 Feb 2026LowPX_HE-1959Cleaning HE-1959
02 Feb 2026LowPX_HE-1959Cleaning HE-1959
11 Aug 2025MediumPX_HE-1959Replace lamp as per PM finding
18 Jul 2025LowPX_HE-1959Install scaffolding at HE-1959
12 Jul 2025MediumPX_HE-1562CInstall scaffolding at HE-1562C
10 May 2025MediumPX_3/4-LS-2770-D12A-HLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
05 Jul 20266201000038942Corrective
13 Apr 20261201000035122Corrective
29 Mar 20265201000007321Corrective
26 Feb 20262201000000733Corrective
04 Dec 20251201000020099Corrective
03 Dec 20252201000032890Corrective
28 Nov 202512203000032713Turnaround
24 Sept 20251201000039559Corrective
01 Sept 20253201000026249Corrective
12 Aug 20251201000003400Corrective
09 Aug 20252201000020369Corrective
20 Jul 20251201000009678Corrective
06 Jul 202510209000024650Other maintenance