FLANGE,BLIND,12IN,150#,SS316,RF

Material 4100033040 · FLANGE · Plant 1000

AReduceExcess
Material
4100033040
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
36 d · P80 40 d
Unit price
Rp 2.0M

Recommendation

  • 1.Forecast 29 EA/year: 29 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~36 days; expected demand during lead time 2.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 20, order up to 35.
  • 4.Stock 65 exceeds the level to keep (35) by 30.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 52% probability of demand in the next 90 days.
ML early warningLast turnaround used 2Single sourceAbnormal consumption
On hand / on order
65 / 0
no open PO
Today Min / Max
14 / 34
static parameters in BoM
Rec. Min (reorder point)
20
safety stock 18
Rec. Max
35
order qty 15
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.0M
PO history
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 13 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (16 units) excluded from the baseline.

Demand pattern Lumpy · 12 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 4 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-574B
INHIBITOR TLE
A100.22
PX_3-IA-6844-C11A
PIPE-3 FROM VD-843C TO VD-1832A
B100.01
PY_HE-1680D
PROPYLENE CONDENSER
B100.22
PX_54-IA-28387-B21A-HS
PIPE->16 FROM PP-1266 TO KC-435A
C320.44

Lead time and procurement

Lead time 36 ± 22 days (PO history, 8 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
07 Aug 2026PR06
Regular replenishment
32Rp 2.0M24 Sept 202648 d
06 Aug 2026PR03
Regular replenishment
10Rp 2.0M01 Sept 202626 d
22 Jul 2026PR06
Regular replenishment
31Rp 2.0M20 Aug 202629 d
17 Mar 2026PR03
Regular replenishment
31Rp 2.0M04 Apr 202618 d
21 Dec 2025PR03
Regular replenishment
21Rp 2.1M11 Jan 202621 d
25 Nov 2025PR03
Regular replenishment
39Rp 2.1M21 Dec 202526 d
17 Jun 2025PR03
Regular replenishment
11Rp 2.1M09 Jul 202522 d
15 Jun 2025PR04
Regular (other)
18Rp 2.1M02 Sept 202579 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Dec 2025HighPX_54-IA-28387-B21A-HSClean dummy leg 54-IA-28387-B21A-HS
09 May 2025MediumPX_54-IA-28387-B21A-HSPSM25/Leak at 54-IA-28387-B21A-HS

Recent goods issues

Posting dateQtyOrderOrder type
18 Sept 202620209000036917Other maintenance
05 Jun 202610203000002440Turnaround
28 Apr 20261205000012364Other maintenance
28 Feb 20261201000015500Corrective
08 Feb 20264203000032991Turnaround
13 Jan 20261201000029999Corrective
09 Dec 20256201000032472Corrective
15 Nov 20252203000023445Turnaround
25 Oct 20254201000001926Corrective
02 Oct 202510201000016291Corrective
20 Sept 20251201000030193Corrective
12 Sept 20252201000009410Corrective
23 Aug 20252201000014098Corrective
05 Aug 20254209000000237Other maintenance
15 Jul 202514209000033701Other maintenance