FLANGE,BLIND,10IN,300#,SS316,RF

Material 4100033041 · FLANGE · Plant 1000

AReorderNormalBelow reorder point
Material
4100033041
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 25 EA/year: 25 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~43 days; expected demand during lead time 3.0.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 19, order up to 40.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 37 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 32% probability of demand in the next 90 days.
Proposed purchase requisition
37 EA
Rp 34.3M · order by 01 Oct 2026
Expected arrival ≈ 43 days
ML early warningLast turnaround used 10Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
19
safety stock 17
Rec. Max
40
order qty 21
Service level
99.8%
stockout risk now 38%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 32% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (32 units) excluded from the baseline.

Demand pattern Intermittent · 11 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1026
METHANE TLE
A100.22
PX_3/4-IA-10141-A22A-HS
PIPE-3/4 FROM HE-528A TO PP-1063
C100.01

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
13 May 20265201000038242Corrective
03 Dec 20256201000009193Corrective
29 Nov 20252201000008439Corrective
19 Nov 202517201000022927Corrective
18 Nov 202510203000038363Turnaround
05 Nov 20251201000015455Corrective
27 Sept 202516209000031701Other maintenance
06 Sept 202510203000006879Turnaround
16 Aug 202514209000024754Other maintenance
15 Aug 20251201000006125Corrective
05 Aug 20251201000018575Corrective
04 Aug 20254201000011189Corrective
31 Jul 20252203000033054Turnaround
28 Jun 202510203000034428Turnaround
17 May 20251201000013692Corrective