FLANGE,BLIND,10IN,300#,SS316,RF
Material 4100033041 · FLANGE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100033041
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 43 d · P80 78 d
- Unit price
- Rp 927,596 (est.)
Recommendation
- 1.Forecast 25 EA/year: 25 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~43 days; expected demand during lead time 3.0.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 19, order up to 40.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 37 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 32% probability of demand in the next 90 days.
Proposed purchase requisition
37 EA
Rp 34.3M · order by 01 Oct 2026
Expected arrival ≈ 43 days
ML early warningLast turnaround used 10Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
19
safety stock 17
Rec. Max
40
order qty 21
Service level
99.8%
stockout risk now 38%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 32% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Intermittent · 11 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1026 METHANE TLE | A | 1 | 0 | 0.22 |
| PX_3/4-IA-10141-A22A-HS PIPE-3/4 FROM HE-528A TO PP-1063 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 May 2026 | 5 | 201000038242 | Corrective |
| 03 Dec 2025 | 6 | 201000009193 | Corrective |
| 29 Nov 2025 | 2 | 201000008439 | Corrective |
| 19 Nov 2025 | 17 | 201000022927 | Corrective |
| 18 Nov 2025 | 10 | 203000038363 | Turnaround |
| 05 Nov 2025 | 1 | 201000015455 | Corrective |
| 27 Sept 2025 | 16 | 209000031701 | Other maintenance |
| 06 Sept 2025 | 10 | 203000006879 | Turnaround |
| 16 Aug 2025 | 14 | 209000024754 | Other maintenance |
| 15 Aug 2025 | 1 | 201000006125 | Corrective |
| 05 Aug 2025 | 1 | 201000018575 | Corrective |
| 04 Aug 2025 | 4 | 201000011189 | Corrective |
| 31 Jul 2025 | 2 | 203000033054 | Turnaround |
| 28 Jun 2025 | 10 | 203000034428 | Turnaround |
| 17 May 2025 | 1 | 201000013692 | Corrective |