FLANGE,WN,10IN,300#,SS316,RF

Material 4100033123 · FLANGE · Plant 1000

AReduceSlow-moving
Material
4100033123
Category
FLANGE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 3.2 EA/year: 3.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 14.
  • 4.Stock 22 exceeds the level to keep (14) by 8.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
22 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 9
Rec. Max
14
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 331 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 281.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 6 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-563
CAUSTIC TLE
A100.22
PX_HE-895B
DEMIN WATER EXCHANGER
A100.22
PX_HE-1727
LUBE OIL COOLER
C131.08
PX_10-BF-13397-D12A-H
PIPE-10 FROM PP-681B TO VD-793A
C210.01
PX_2-P-13414-C11A-H
PIPE-2 FROM KC-452 TO HE-418
C100.01
PX_3-QO-22033-A41A-H
PIPE-3 FROM VD-958 TO VD-783
C100.01

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 May 2026MediumPX_HE-1727HE-1727 fouling
22 Sept 2025MediumPX_HE-1727HE-1727 fouling
30 May 2025LowPX_10-BF-13397-D12A-HReplace lamp as per PM finding
12 May 2025MediumPX_HE-1727Retubing HE-1727

Recent goods issues

Posting dateQtyOrderOrder type
04 Nov 20256201000008280Corrective
12 Jul 20253204000010232Preventive