FLANGE,BLIND,1IN,300#,SS316,RF
Material 4100033154 · FLANGE · Plant 1000
AMonitorInsurance gap
- Material
- 4100033154
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 43 d · P80 78 d
- Unit price
- Rp 927,596 (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~43 days; expected demand during lead time 0.0.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
99.4%
stockout risk now 1%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 21.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1554B FEED REBOILER | A | 1 | 4 | 1.08 |
| PX_HE-853C SEAL OIL EXCHANGER | B | 1 | 0 | 0.22 |
| PX_3/4-LS-7878-C11A PIPE-3/4 FROM KC-910C TO HE-1243B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 09 Apr 2026 | Medium | PX_HE-1554B | Leak from packing |
| 14 Dec 2025 | Medium | PX_HE-1554B | [MSI-B-25-NBE-121/M] Replace line |
| 22 Oct 2025 | High | PX_HE-1554B | Install scaffolding at HE-1554B |
| 23 May 2025 | High | PX_HE-1554B | Repair insulation HE-1554B |
Recent goods issues
Never issued in the 17-month history.