FLANGE,SO,6IN,600#,SS316,RF
Material 4100033159 · FLANGE · Plant 1000
BReorderCriticalStockout
- Material
- 4100033159
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 4 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 36 d · P80 35 d
- Unit price
- Rp 2.1M
Recommendation
- 1.Forecast 5.4 EA/year: 5.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~36 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 11.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 23.0M · order by 01 Oct 2026
Expected arrival ≈ 36 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
11
order qty 6
Service level
99.9%
stockout risk now 19%
Unit price
Rp 2.1M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 15 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 218.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1098D C4 PRODUCT EXCHANGER | B | 1 | 1 | 0.22 |
| PX_1-1/2-CW-16735-B23A-H PIPE-1-1/2 FROM KC-886D TO PP-1710 | C | 1 | 0 | 0.01 |
| PX_3-FG-17006-C11A-H PIPE-3 FROM HE-152A TO PP-445 | C | 1 | 0 | 0.01 |
| PX_ROF-977 LP STEAM TO HE-1744A | C | 1 | 0 | 0.00 |
Lead time and procurement
Lead time 36 ± 13 days (PO history, 5 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Aug 2026 | PR03 Regular replenishment | 3 | Rp 2.2M | 26 Sept 2026 | 39 d |
| 19 Feb 2026 | PR06 Regular replenishment | 2 | Rp 2.1M | 18 Mar 2026 | 27 d |
| 19 Dec 2025 | PR06 Regular replenishment | 3 | Rp 2.1M | 22 Jan 2026 | 34 d |
| 19 Sept 2025 | PR03 Regular replenishment | 3 | Rp 2.0M | 21 Oct 2025 | 32 d |
| 23 Aug 2025 | PR06 Regular replenishment | 4 | Rp 2.0M | 17 Sept 2025 | 25 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 May 2025 | High | PX_HE-1098D | Retubing HE-1098D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Sept 2026 | 1 | 201000023922 | Corrective |
| 29 Jan 2026 | 2 | 201000039770 | Corrective |
| 24 Jan 2026 | 1 | 201000006146 | Corrective |
| 24 Jan 2026 | 2 | 201000006146 | Corrective |
| 05 Oct 2025 | 4 | 201000010350 | Corrective |