FLANGE,SO,6IN,600#,SS316,RF

Material 4100033159 · FLANGE · Plant 1000

BReorderCriticalStockout
Material
4100033159
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
36 d · P80 35 d
Unit price
Rp 2.1M

Recommendation

  • 1.Forecast 5.4 EA/year: 5.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~36 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 11.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 23.0M · order by 01 Oct 2026
Expected arrival ≈ 36 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
11
order qty 6
Service level
99.9%
stockout risk now 19%
Unit price
Rp 2.1M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 15 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 218.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1098D
C4 PRODUCT EXCHANGER
B110.22
PX_1-1/2-CW-16735-B23A-H
PIPE-1-1/2 FROM KC-886D TO PP-1710
C100.01
PX_3-FG-17006-C11A-H
PIPE-3 FROM HE-152A TO PP-445
C100.01
PX_ROF-977
LP STEAM TO HE-1744A
C100.00

Lead time and procurement

Lead time 36 ± 13 days (PO history, 5 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR03
Regular replenishment
3Rp 2.2M26 Sept 202639 d
19 Feb 2026PR06
Regular replenishment
2Rp 2.1M18 Mar 202627 d
19 Dec 2025PR06
Regular replenishment
3Rp 2.1M22 Jan 202634 d
19 Sept 2025PR03
Regular replenishment
3Rp 2.0M21 Oct 202532 d
23 Aug 2025PR06
Regular replenishment
4Rp 2.0M17 Sept 202525 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 May 2025HighPX_HE-1098DRetubing HE-1098D

Recent goods issues

Posting dateQtyOrderOrder type
16 Sept 20261201000023922Corrective
29 Jan 20262201000039770Corrective
24 Jan 20261201000006146Corrective
24 Jan 20262201000006146Corrective
05 Oct 20254201000010350Corrective