FLANGE,SO,8IN,150#,A105,RF
Material 4100033183 · FLANGE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100033183
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- GUNUNG SARANA SENTOSA PT
- Lead time
- 40 d · P80 45 d
- Unit price
- Rp 969,625
Recommendation
- 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~40 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 15.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 13 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
13 EA
Rp 12.6M · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
15
order qty 5
Service level
100.0%
stockout risk now 9%
Unit price
Rp 969,625
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 79 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 357.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_ROF-1109 RESTRICTION ORIFICE | A | 1 | 0 | 0.00 |
| PX_HE-1813A DEMIN WATER REBOILER | B | 1 | 3 | 1.50 |
| PX_HE-682D RECYCLE ETHANE REBOILER | B | 1 | 0 | 0.22 |
| PX_2-LS-13224-A21A-H PIPE-2 FROM CL-398 TO PP-1160 | C | 1 | 1 | 0.01 |
Lead time and procurement
Lead time 40 ± 18 days (PO history, 4 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 May 2026 | PR03 Regular replenishment | 1 | Rp 942,662 | 25 Jun 2026 | 29 d |
| 06 Mar 2026 | PR03 Regular replenishment | 2 | Rp 982,067 | 13 Apr 2026 | 38 d |
| 05 Feb 2026 | PR03 Regular replenishment | 1 | Rp 963,090 | 02 Apr 2026 | 56 d |
| 03 Aug 2025 | PR03 Regular replenishment | 1 | Rp 976,159 | 02 Sept 2025 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_HE-1813A | Cleaning HE-1813A |
| 18 Mar 2026 | Low | PX_HE-1813A | Cleaning HE-1813A |
| 07 Jul 2025 | Low | PX_HE-1813A | Retubing HE-1813A |
| 03 May 2025 | Medium | PX_2-LS-13224-A21A-H | Replace pipe 2-LS-13224-A21A-H |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jul 2026 | 2 | 201000034553 | Corrective |
| 14 Jul 2026 | 3 | 201000034553 | Corrective |