FLANGE,WN,2IN,150#,A105,RF

Material 4100033191 · FLANGE · Plant 1000

AMonitorInsurance gap
Material
4100033191
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~43 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
10 / 21
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 84.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1660A
REFLUX CONDENSER
A152.36
PX_HE-1396C
PROPYLENE TLE
C172.79
PX_3/4-CW-27934-A51A-T
PIPE-3/4 FROM KC-930C TO PP-506A
C100.01

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_HE-1396C[MSI-B-26-NWH-385] Permanent repair
15 Sept 2026EmergencyPX_HE-1660A[MSI-B-26-ZCD-129] Permanent repair
15 Jun 2026MediumPX_HE-1396C[MSI-B-26-DDD-161] Permanent repair
22 Apr 2026LowPX_HE-1396CRetubing HE-1396C
03 Apr 2026HighPX_HE-1396CCleaning HE-1396C
25 Mar 2026MediumPX_HE-1660ACleaning HE-1660A
10 Feb 2026MediumPX_HE-1396CHE-1396C fouling
13 Jan 2026MediumPX_HE-1660ALeak from packing
07 Nov 2025MediumPX_HE-1396CLeak from packing
13 Sept 2025MediumPX_HE-1660ACleaning HE-1660A

Recent goods issues

Never issued in the 17-month history.