FLANGE,BLIND,8IN,300#,A105,RF

Material 4100033405 · FLANGE · Plant 1000

CReducePotentially obsolete
Material
4100033405
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~43 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 6 exceeds the level to keep (0) by 6.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 402,395/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~19 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1912
QUENCH OIL EXCHANGER
C141.08
PX_3-P-1150-C11A-H
PIPE-3 FROM HE-442C TO PP-942D
C120.01
PX_3/4-BF-12683-A21A
PIPE-3/4 FROM PP-301C TO HE-1205D
C100.01

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026LowPX_3-P-1150-C11A-HInstall scaffolding at 3-P-1150-C11A-H
02 Aug 2026MediumPX_HE-1912Replace lamp as per PM finding
13 Mar 2026MediumPX_HE-1912Install scaffolding at HE-1912
12 Mar 2026MediumPX_HE-1912Leak from packing
29 May 2025MediumPX_HE-1912Leak from packing
05 May 2025HighPX_3-P-1150-C11A-HPainting 3-P-1150-C11A-H

Recent goods issues

Never issued in the 17-month history.