FLANGE,BLIND,8IN,300#,A105,RF
Material 4100033405 · FLANGE · Plant 1000
CReducePotentially obsolete
- Material
- 4100033405
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 43 d · P80 78 d
- Unit price
- Rp 927,596 (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~43 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 6 exceeds the level to keep (0) by 6.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 402,395/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~19 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1912 QUENCH OIL EXCHANGER | C | 1 | 4 | 1.08 |
| PX_3-P-1150-C11A-H PIPE-3 FROM HE-442C TO PP-942D | C | 1 | 2 | 0.01 |
| PX_3/4-BF-12683-A21A PIPE-3/4 FROM PP-301C TO HE-1205D | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Low | PX_3-P-1150-C11A-H | Install scaffolding at 3-P-1150-C11A-H |
| 02 Aug 2026 | Medium | PX_HE-1912 | Replace lamp as per PM finding |
| 13 Mar 2026 | Medium | PX_HE-1912 | Install scaffolding at HE-1912 |
| 12 Mar 2026 | Medium | PX_HE-1912 | Leak from packing |
| 29 May 2025 | Medium | PX_HE-1912 | Leak from packing |
| 05 May 2025 | High | PX_3-P-1150-C11A-H | Painting 3-P-1150-C11A-H |
Recent goods issues
Never issued in the 17-month history.