FLANGE,SO,1IN,150#,A105,RF

Material 4100033410 · FLANGE · Plant 1000

CReducePotentially obsolete
Material
4100033410
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
43 d · P80 78 d
Unit price
Rp 927,596 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~43 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 27 exceeds the level to keep (0) by 27.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
27 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 927,596
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 80,762/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~19 days.

Installed on 2 functional locations

0 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1966D
ETHYLENE CONDENSER
C400.22
PY_ROF-1925B
MP STEAM TO PP-866A
C300.00

Lead time and procurement

Lead time 43 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.