FLANGE,WN,12IN,150#,A105,RF

Material 4100034038 · FLANGE · Plant 1000

CMonitorSlow-moving
Material
4100034038
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
PRIMA LOGAM NUSANTARA PT
Lead time
36 d · P80 78 d
Unit price
Rp 218,390

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~36 days; expected demand during lead time 0.0.
  • 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.1%
stockout risk now 0%
Unit price
Rp 218,390
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 276 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~19 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-DS-3691-D12A-C
PIPE-1-1/2 FROM PP-463 TO HE-1685D
C100.01
PX_2-P-22817-C11A-T
PIPE-2 FROM HE-1441D TO VD-422
C100.01

Lead time and procurement

Lead time 36 ± 25 days (PO history + category, 2 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
19 Jul 2026PR04
Regular (other)
2Rp 220,10026 Aug 202638 d
04 Mar 2026PR06
Regular replenishment
1Rp 216,68019 Mar 202615 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
29 Dec 20252201000001694Corrective