FLANGE,BLIND,4IN,150#,SS316,RF

Material 4100034063 · FLANGE · Plant 1000

BReduceSlow-moving
Material
4100034063
Category
FLANGE
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 2 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
51 d · P80 79 d
Unit price
Rp 2.0M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~51 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Single sourceOpen PO
On hand / on order
5 / 2
next delivery 21 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.0M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 358 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 45.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1652D
CAUSTIC EXCHANGER
B131.08
PX_3/4-FG-25312-D12A-HS
PIPE-3/4 FROM PP-645A TO HE-245
B100.01

Lead time and procurement

Lead time 51 ± 32 days (PO history, 3 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
2Rp 2.0M21 Dec 2026
open
103 d
19 Jun 2026PR06
Regular replenishment
1Rp 2.1M22 Jul 202633 d
28 Jan 2026PR04
Regular (other)
2Rp 1.9M11 Mar 202642 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Aug 2026MediumPX_HE-1652DHE-1652D tube leak
16 Dec 2025LowPX_HE-1652DRetubing HE-1652D
10 May 2025LowPX_HE-1652DHE-1652D tube leak

Recent goods issues

Posting dateQtyOrderOrder type
08 Oct 20251201000030663Corrective
Sparely