FLANGE,BLIND,4IN,150#,SS316,RF
Material 4100034063 · FLANGE · Plant 1000
BReduceSlow-moving
- Material
- 4100034063
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- BINTANG MESINDO PRATAMA PT
- Lead time
- 51 d · P80 79 d
- Unit price
- Rp 2.0M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~51 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 5 exceeds the level to keep (2) by 3.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Single sourceOpen PO
On hand / on order
5 / 2
next delivery 21 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.0M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 358 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 45.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1652D CAUSTIC EXCHANGER | B | 1 | 3 | 1.08 |
| PX_3/4-FG-25312-D12A-HS PIPE-3/4 FROM PP-645A TO HE-245 | B | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 51 ± 32 days (PO history, 3 PO lines) · on-time 49%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR03 Regular replenishment | 2 | Rp 2.0M | 21 Dec 2026 open | 103 d |
| 19 Jun 2026 | PR06 Regular replenishment | 1 | Rp 2.1M | 22 Jul 2026 | 33 d |
| 28 Jan 2026 | PR04 Regular (other) | 2 | Rp 1.9M | 11 Mar 2026 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Aug 2026 | Medium | PX_HE-1652D | HE-1652D tube leak |
| 16 Dec 2025 | Low | PX_HE-1652D | Retubing HE-1652D |
| 10 May 2025 | Low | PX_HE-1652D | HE-1652D tube leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Oct 2025 | 1 | 201000030663 | Corrective |