FLANGE,SO,1IN,600#,SS316,RF
Material 4100034258 · FLANGE · Plant 1000
BReduceSlow-moving
- Material
- 4100034258
- Category
- FLANGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 30 d · P80 22 d
- Unit price
- Rp 153,982
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~30 days; expected demand during lead time 0.1.
- 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 6.
- 4.Stock 32 exceeds the level to keep (6) by 26.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
32 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
6
order qty 6
Service level
98.9%
stockout risk now 0%
Unit price
Rp 153,982
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 384 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_ROF-1988 LP STEAM TO KC-216B | B | 1 | 0 | 0.00 |
| PX_1-FG-3358-D12A-C PIPE-1 FROM KC-223 TO PP-128A | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 30 ± 17 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Jul 2026 | PR03 Regular replenishment | 1 | Rp 154,789 | 12 Aug 2026 | 28 d |
| 15 Sept 2025 | PR04 Regular (other) | 1 | Rp 153,982 | 27 Sept 2025 | 12 d |
| 06 Sept 2025 | PR03 Regular replenishment | 2 | Rp 152,542 | 19 Sept 2025 | 13 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Sept 2025 | 2 | 201000013839 | Corrective |
| 12 Sept 2025 | 4 | 201000013839 | Corrective |